My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Solo Construction Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Responses
>
Solo Construction Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 3:19:15 PM
Creation date
1/28/2011 3:19:09 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St.
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />JUL-12-2007 THU 09:00 AM CALVIN GIORDANO <br /> <br />FAX NO. 9549218807 <br /> <br />P. 05/09 <br /> <br />therefore, difficult to say what you wiu run into. You will definitely run into <br />sand and muel" ~l variety of rnlltel'illl. <br />j. Question: Do you have borings? <br />Answer: Yes. We have some borings, We will provide you with borings. <br />Assistant City Manager/Service Jorge Vera advised that by the time that the <br />contractor starts, he wiu have FPL's design and make the dropping of the pipes <br />an add-on, He advised that FPL wiIJ not drop the pipes, the contractor will, <br />FPL will not furnish the pipes either. They will tell us how much they need. He <br />will be having a meeting with FPL and advise you through an addendum, <br />k. Question: You mentioned FPL. Have the utilities been moved out of the way? <br />Answer: No. We have gathered as much informntion of the underground as <br />possible (i.e. field survey, contacted utilities companies, etc.), It is not an <br />extremely busy street beneath the surface but they would not be able to design a <br />straight FI>L line. There will have to be some offsets because there are items that <br />are not made parallel. Once FPL gives us their plans, a design will be included <br />and forwarded to you as an addendum, <br />l. Question: Do we have all the permits? <br />Answer: Yes. <br />m. Question: Will the contractor be reimbursed for the permitfees? <br />Answer: If you are talking about Building Department permit fees, we suggest <br />thllt you put it in your bid as it will be the contractor's responsibility. <br />n. Question: There is a quantity discrepancy between bid item and actual plans, under <br />drainage pipes. <br />Answer: That may have occurred if DERM had instructed us to do something <br />different. There is probably ll.'Ss on the plans then on the bid. We will review it <br />and get you an addendum right away. <br />o. Question: Is this work to be done in accordance with FDOT specifications? <br />Answer: Yes, in accordance with FDOT, <br />p. Question: JiVhat about the service to light poles? 'Where is the main service <br />connectionfrom FPL? <br />Answer: There is already a service plate at North Bay Road because they just <br />~ completed it. <br />17. The Engineer of Record for this project is Calvin, Giordano & Associates, Inc. Please <br />forward all engineering related correspondence (in writing) not later than 7 days prior bid <br />opening to the attention of: <br /> <br />Sabrina M. Baglieri <br />Calvin, Giordano & Associates, Inc. <br />1800 Eller Dlive, Suite 600 <br />Fort Lauderdale, Florida 33316 <br />sbaglieri@calvin-giorando.com <br /> <br />The meeting was adjollmed atlll :00 A.m. <br /> <br />J':\ProjCCLSI2003\034197 Sunny ,-,Ic" NE 172nd Srrccl\Ccrrcspondencc\MinutcsVM-062707-Pre-Bid Minutes.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.