Laserfiche WebLink
<br />. Post Design Services (Shop drawing review and Response to <br />Request for Information) <br />. Bid Administration (Selection and Letting) <br />. Construction Management and Inspection (CEI) <br /> <br />Conceptual sketches of this structure shall be presented at a mandatory <br />Pre-Submittal Conference to be held on at 10:00 a.m., Wednesday, May <br />16, 2007 in the First Floor Meeting Room of the Sunny Isles Beach <br />Government Center Building located at 18070 Collins Avenue. <br />Attendance at this meeting is mandatory, and submittals from firms not in <br />attendance will be rejected. <br /> <br />All responses by consulting firms to the RFQ (hereinafter referred to as <br />their submittal) shall contain no more than fifteen pages. To be eligible, the <br />consultants must submit five (5) complete copies of the submittal that <br />include, at a minimum, the following information: <br /> <br />1. Name, address and company, including, but not limited to, a <br />business overview, financial state of the business, annual revenue <br />for past two years, and names and addresses of persons having <br />financial interest in the firm. If sub-consultants are used, the bid <br />must specify the type of contractual agreement between all firms <br />and include certificate(s) of authorization to offer professional <br />services through the Florida State Board of Engineers, including <br />the prime and supporting firms. <br />2. A list of all projects (including governmental projects) completed or <br />in process for the past five years, and a corresponding list of client <br />references with contact names and telephone numbers. <br />3. Proof of authorization to transact business in Florida from the <br />Florida Secretary of State, from the prime as well as supporting <br />firms. <br />4. Appropriate current Federal 254 and 255 forms showing the firm <br />data and supporting the firm's ability to perform each category of <br />work required. NOTE: These forms will not be counted as <br />part of the fifteen paQe maximum. <br />5. The name, title, qualifications, experience, and all contact <br />information of the proposed project manager. <br />6. A listing of the proposed personnel to be assigned to the project, <br />listing their qualifications and experience. <br />7. A listing of all permits expected to be necessary, and the issuing <br />agencies that will be involved. <br /> <br />Page 4 of 7 <br /> <br />07-04-02 Gen Eng Sri'S Herirage Pk Garage Bid (Rfq) <br /> <br />4/23/2007 II :39 AM <br />