Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />DESCRIPTION OF RELEVANT PROJECTS <br /> <br /> <br />PROJECTEXPE~ENCE <br /> <br /> <br />Hillsboro Boulevard Improvements, Deerfield Beach CRA: <br />Project included surveying and ,engineering design for <br />reconstruction and improvements to approximately 4,800 linear feet <br />of Hillsboro Boulevard (SR. 810) from USf to State Road A-1-A. <br />Project improvements include roadway cross"-section, underground <br />utilities, drainage 1I1l.1.SIlORt! 1I0~LEVi\~D IMI'RO\'EME:"TS <br />improvements, mast arm ( Ily 01 Deerllcld Beach <br />signals, utility coordination for <br />burial of overhead lines, box <br />culvert rehabilitation, safety <br />improvements, landscape and <br />streetscape, decorative lighting and bid assistance. <br />Project included public involvement workshops to obtain <br />stakeholder participation in the design phases of the <br />project. Construction scheduled to begin in 2007, with a <br />project budget $10.3 million. <br /> <br />..~ <br />-'~ <br /> <br /> <br />A:- <br />T~.- <br /> <br />r: <br /> <br />....:..~9..;;~:.-:..: ..-.- ..~:::. ;::.: -'- .~.~......:..... <br /> <br />J H'Ie \I "RI Ie I'(,AI'( SIl Ill" <br /> <br />Contact Person <br />City of Deerfield Beach <br />Carlos Baia, Manager of Economic Development <br />(954) 480-4222 <br /> <br />Ocean Way, Deerfield Beach CRA Project: Complete engineering design, topographic <br />surveying, and construction administration for a 1-mile portion of Ocean Way in the City of <br />Deerfield Beach. Objective was to resolve significant drainage issues and provide traffic <br />calming and beautification in the corridor. Services included complete engineering design, <br />construction engineering inspection and extensive <br />community liaison services. Project improvements included <br />new stormwater system to <br />address flooding issues and <br />replace a dilapidated existing <br />system. Streetscape design <br />'f elements included decorative <br />brick paver sidewalks, <br />"&' gateway entrance features, <br />and paver crosswalks. Marine <br />sea turtle compliant lighting concerns were addressed as well. <br />This was a time sensitive project which was completed on time <br />and under budget. 18 month construction, completed in 2005 - project budget $2.9 million. <br /> <br /> <br /> <br />Contact Person <br />Deerfield Beach CRA <br />Carlos Baia, Manager of Economic Development <br />(954) 480-4222 <br /> <br />IC!iE~~:!;;! <br /> <br />consulting engineers <br />