My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Choice Environmental
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(11-01-01) Waste Management Svcs.
>
Responses
>
Choice Environmental
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2015 9:41:07 AM
Creation date
2/11/2011 1:46:47 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Waste Mgmt. Svcs.
Bid No. (xx-xx-xx)
11-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
x 11 <br />�S.fNY �S�F <br />s <br />S� lx FLOG 5 <br />C,TY OF sutA PNO <br />Addendum No. 2 <br />CITY OF SUNNY ISLES BEACH <br />Waste Management Services <br />CITY RFQ BID NO. 11 -01 -01 <br />11597T.1111111-3081M <br />Bidders for the above - referenced project shall take note of the following changes, <br />additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br />➢ Amendment to Section 3.0, paragraph 3.4 shall be replaced with the following <br />(additions are underlined in red and deletions are 6tr+sken in black); <br />3.4 RENTAL RATES <br />The bidder shall supply an all inclusive flat monthly rate that will include all <br />labor and materials required to complete the job. The bidder shall take into <br />consideration the items listed bellow in their monthly rental rate and these <br />items shall not be included on the monthly invoice as additional charges to <br />the City; <br />• Mobilization / Trip <br />• Fuel / Environmental Charges <br />• Permits <br />• Equipment <br />• Pick up <br />• Disposal <br />• Administration Fees <br />➢ Response to Questions: <br />1) Is there a Bid Security or a Performance Bond with the Bid 11 -01 -01 that <br />has to be submitted? Section 1 of the bid states that there is; yet sections <br />2 and 3 of the Bid state that there is none. <br />y <br />C\ <br />x <br />S� lx FLOG 5 <br />C,TY OF sutA PNO <br />Addendum No. 2 <br />CITY OF SUNNY ISLES BEACH <br />Waste Management Services <br />CITY RFQ BID NO. 11 -01 -01 <br />11597T.1111111-3081M <br />Bidders for the above - referenced project shall take note of the following changes, <br />additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br />➢ Amendment to Section 3.0, paragraph 3.4 shall be replaced with the following <br />(additions are underlined in red and deletions are 6tr+sken in black); <br />3.4 RENTAL RATES <br />The bidder shall supply an all inclusive flat monthly rate that will include all <br />labor and materials required to complete the job. The bidder shall take into <br />consideration the items listed bellow in their monthly rental rate and these <br />items shall not be included on the monthly invoice as additional charges to <br />the City; <br />• Mobilization / Trip <br />• Fuel / Environmental Charges <br />• Permits <br />• Equipment <br />• Pick up <br />• Disposal <br />• Administration Fees <br />➢ Response to Questions: <br />1) Is there a Bid Security or a Performance Bond with the Bid 11 -01 -01 that <br />has to be submitted? Section 1 of the bid states that there is; yet sections <br />2 and 3 of the Bid state that there is none. <br />
The URL can be used to link to this page
Your browser does not support the video tag.