Laserfiche WebLink
<br />I <br />I <br />!I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Professional General Engineering Consultant 2 -Statement of Qualifications <br /> <br />Roles & Responsibilities <br /> <br />McMahon is confident in its team and personnel and their ability to deliver a superior <br />product--not only in terms of engineering and innovation--but also project <br />management. Successful projects are the results of excellent project management. Mr. <br />Thomas A. Hall will serve as Project Manager/Principal-in-Charge. Mr. Hall is a <br />talented project manager with 33 years of engineering experience and a track record for <br />delivering projects on time and within budget. Mr. Juan C. Villalba, P.E" P.T.D.E., <br />with experience in all aspects of traffic engineering, transportation planning, operations <br />optimization, continuous enhancement and re-engineering projects, will serve as the <br />Traffic Engineering Project Manager. Mr. Adam K. Maze, P.E" with a vast array of <br />experience including, but not limited to, pavement design, drainage analysis and <br />design, geometric design, maintenance of traffic, lighting, signalization, specifications <br />package preparation, and phase submittal preparation and delivery will lead the <br />Roadway Engineering tasks. John Kim. P.E., P.T.D.E. will lead the Planning and <br />Feasibility Study tasks. John's tenure as the Section Head of the Traffic Concurrency <br />Section with the Traffic Engineering Division of Miami-Dade County included <br />managing the entire Traffic Concurrency Management Program for the County. Since <br />becoming a consultant four years ago, he has assisted many municipalities with their <br />transportation planning needs. Mr. Trent Ebersole, P.E. will serve as the Engineer of <br />Record for Civil Engineering. To ensure a high degree of excellence not only in our <br />technical assignments, but management as well, Richard DiCesare, P.E., P.T.D.E. will <br />conduct quality reviews for the project from work authorization to project completion. <br />Mr. DiCesare will work with Tom Hall to coordinate all assignments performed by <br />McMahon and our sub-consultants that include quality assurance reviews. <br /> <br />Our strong local presence and immediate availability of experts will ensure the City of <br />Sunny Isles Beach a quick response to assignments. In addition, because of our size and <br />that of our teammates, McMahon offers the ability to complete multiple, simultaneous <br />task assignments. <br /> <br />The following table summarizes the key staff with years of experience and assigned <br />roles for this project. Our project management approach is simple and uncomplicated. <br />The key staff role chart is shown below. The resumes of our key staff are included in <br />Section 7 of the Standard Form 255. <br /> <br /><I~~M!,}"t!Q,~ <br /> <br />Page 2 of 3 <br />