Laserfiche WebLink
<br />I <br /> <br /> <br />10 <br /> <br />o <br /> <br />o <br /> <br />BUSINESS STRUCTURE <br /> <br />ARCHITEKNICS, INC. is a certified Minority / Women Business Enterprise with all of the personnel <br />available to participate in any project for the time frame to be scheduled by the City of <br />Sunny Isles Beach. The structure of our firm, having three principals that are registered <br />architects, allows us to manage many projects simultaneously while still maintaining the <br />personal and professional service we provide the Owner. In addition, it allows us to grow to <br />varying capacities as required at said time. <br /> <br />Location: <br /> <br />ARCHITEKNICS, INC. <br />7450 S.W. 48 STREET <br />MIAMI, FL 33155 <br /> <br />Ownership is divided as follows: <br /> <br />Lourdes Rodriguez <br />1026 Aduana Avenue <br />Coral Gables, FL 33146 <br /> <br />33 - 1/3% <br /> <br />Edward C. Berounsky <br />62 11 Paradise Point Drive <br />Palmetto Bay, FL 33157 <br /> <br />20% <br /> <br />Geraldine T. Berounsky <br />6211 Paradise Point Drive <br />Palmetto Bay, FL 33157 <br /> <br />13- 1/3% <br /> <br />Ramon Perez-Alonso <br />1018 Andora A venue <br />Coral Gables, FL 33146 <br /> <br />20% <br /> <br />Delia M. Perez-Alonso <br />1018 Andora Avenue <br />Coral Gables, FL 33146 <br /> <br />13 - 1/3% <br /> <br />The proposed team is uniquely capable due to the following: <br /> <br />· We are very experienced at anticipating and recognizing systems and any scopes <br />that would be impacted by the scope of work programmed. <br />· Proposed team works "pro-actively" and with due diligence to resolve issues and <br />keep the project progressing as scheduled. <br />· Principal personnel participation by all team consultants. <br />· We are well versed with the Design Criteria for South Florida. <br />· We are well versed with SREF, ADA and Florida Building Code and all related codes. <br /> <br />With our extensive experience, we can anticipate possible problem issues and address these <br />in the construction documents to prevent possible future change orders. In addition, we are <br />committed to maintaining any time schedule requested by the City of Sunny Isles Beach with <br />the quality required for the projects to be successful. <br /> <br />~ <br />