My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SA Consultants
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Responses
>
SA Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2011 11:51:02 AM
Creation date
3/10/2011 11:51:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MAY-} \J-~UUtl lHU U J : j { t'l'l \.iHL V j N u j UIWHI'lV <br /> <br />rnl\ J1V, iJJ"tiJLIVVVI <br /> <br />Sunny Isles Beach: City Hall Improvements <br /> <br />Item <br />No, <br /> <br />UNIT PRICE BID SCHEDULE <br /> <br />Estimated <br />Quantity Unit <br /> <br />Unit Price <br /> <br />~ <br /> <br />I I Vvl J,V <br /> <br />Estimated <br />Amount <br /> <br />~ \\'lfoo~ <br /> <br />~ 1. 60/000- <br /> <br />~ 'l.o/000 <br />~ 1 0 ,000'- <br />t 30 f 000 - <br /> <br />,- <br />~_3 S t-Qp..'L",- _, <br />~ Q,\,ooo- <br />~_~":",,_,,Q(2~~ _', <br /> <br />~ 4~4/oo0 <br /> <br />Description <br /> <br />1 <br /> <br />New storefront glass enclosure for existing east <br />stair, 15\ floor. <br />New concrete roof over existing Post office, 1st <br />floor. 1 Ul floor oeiling of the existing Garage <br />Building shall be cleaned, primed, and painted, <br />Only the 1 Ht floor ceiling is to be painted, which <br />means that all other ceilings will not be painted. <br />Please refer to the Specifications Book for <br />painting materials and execution, <br />New vestibule entrance for existing Council <br />Chambers, 1 at floor, <br />New storefront glass in 'front of existing elevator <br />cloors, 2n<l floor. <br />New floor drains installed into existing concrete <br />slab, 3rd floor, <br />New galvanized steel canopy over exiting <br />elevator doors, 3rd floor. <br />New entrance into existing building, connecting <br />3f<l floor parking with 31'd floor offices, inc!. steel <br />s.tair <br />New entrance to existIng Generator Room <br /> <br />\ <br /> <br />" <br /> <br />2 <br /> <br />\ <br /> <br />3 <br /> <br />4 <br />5 <br />6 <br /> <br />7 <br />8 <br /> <br />GRAND TOTAL (Items 1-8) <br /> <br /> <br />~O\)(l. T}{OU5AvO <br />(Written) <br /> <br />Final Version <br /> <br />00300-2 <br /> <br />VowflA <br /> <br />5 <br /> <br /> <br />08. <br />(Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.