Laserfiche WebLink
<br /> Atlantic Isles Roadway and Utility Improvements <br />Bid Estimated <br />Item Description Quantity Unit Unit Price Estimated Total <br />III. Electrical <br />A Street Lighting <br /> 60 Furnish and install decorative light pole cost 33 EA $ $ <br /> 61 Furnish and install decorative light fixture cost 33 EA $ $ <br /> 62 Wiring of light fixtures 33 EA $ $ <br /> 63 Copper wiring (1/0 Awg) 1 6,000 LF $ $ <br /> 64 Furnish and install 2" schedule 40 PVC conduit <br /> to include trenching (6" x 12" deep), backfill $ $ <br /> and restoration 4,000 LF <br /> 65 Handholes 33 EA $ $ <br /> 66 Copper clad ground rods 33 EA $ $ <br />B Lift Station <br /> 67 Equipment rack 1 EA $ $ <br /> 68 10 Awg copper wire 300 EA $ $ <br /> 69 3 Awg copper wire 42 LF $ $ <br /> 70 Fall 25kva transformer 1 EA $ $ <br /> 71 Pump control panel 1 EA $ $ <br /> 72 Disconnect switch (1 OOAO 1 EA $ $ <br /> 73 1/2" RGS 300 LF $ $ <br /> 74 Copper clad ground rods 1 EA $ $ <br /> Subtotal-Electrical $ <br />IV. Miscellaneous <br /> 75 Contingency LS $ 250,000.00 $ 250,000.00 <br />V. FPL Undergrounding <br /> 76 Allowance Account LS $500,000.00 $5,000,000.00 <br /> TOT AL BASE BID (Item I Thru VI 1$ ~ <br /> Written <br /> (Contractor) (Date) <br /> <br />05/08 <br /> <br />00300-4 <br /> <br />05-4893 <br />