My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sun Recycling
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 08-07-01 Emergency Debris Clearing and Removal
>
Responses
>
Sun Recycling
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2011 4:54:33 PM
Creation date
3/23/2011 4:54:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Emergency Debris Clearing
Bid No. (xx-xx-xx)
08-07-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Part B - Hourly Prices <br /> <br />Equipment and Labor Rates <br />Equipment Type Typical Hourly Hourly Total <br /> Clearing Equipment Labor Hourly <br /> Crew Rate Rate Rate <br /> Makeup <br />Bobcat Loader 5 f) (10 "'"-35 .'1~.02 <br />Bucket Truck It , ta5~ <br />Chiooer/Mulcher (8" throat) 111 A-- <br />Chiooer/Mulcher (12" throat) fUtr <br />Crew Foreman w/CeIl Phone and Pickup - rsl <br />Dume Truck, 18 CY-20 CY .Ul <br />Dume Truck, 21 CY-30 CY ~ <br />Grader w/12' Blade " ) '"-- <br />Hvdraulic Excavator, 1.5 CY , ) <br />Hvdraulic Excavator, 2.5 CY "1 <br />Knuckleboom Loader , <br />Laborer w/Chain Saw 'I <br />Laborer w/small tools, traffic control, flaa oerson ,~ ) <br />Lowbov Trailer wfTractor .r () <br />Mobile Crane (AdeQuate for hanaina limbslleanina trees) I. , ~~ <br />Ooerations Manaaer w/Cell Phone and Pickup ffj <br />Pickuo Truck, 1/2 Ton ~t F) <br />Traffic Control, Temporary Sinale Lane Closure !>.' <br />Tree Climber S/Chainsaw .( <br />Wheel Loader, 2.5 CY, 950 or similar b' ::> <br />Wheel Loader, 3.5 - 4.0 CY, 966 or similar . f t> <br />Wheel Loader, 4.5 CY, 980 or similar Il 2.00 <br />Wheel Loader-Backhoe, 1.0 - 1.5 CY ~to5 <br />Other - Please List <br /> <br />Notes: <br /> <br />Note 1. Total Time and Material Prices shall Include all labor (operators, laborers, and supervisors), equipment and materials including but not limited <br />to: supplies, equipment maintenance, repairs, repair parts, fuels, lubricants, cellular phones, transportation, trafftc control and housing, " required, <br />II8C8IIlIIry to accomplish the project <br /> <br />Note 2. IdenUfy the EqulpmentlPersonnelll1at constlluta a Typical Clearing Crew In the column provided <br /> <br />The Contractor will provide L (number) of crews dedicated to perform the Work within the first 24 <br />hours following Notice to Proceed. <br /> <br />The Contractor will provide 8' (number) of crews dedicated to perform the Work within the first 48 <br />hours following Notice to Proceed. <br /> <br />45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.