My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Phillips & Jordan
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 08-07-01 Emergency Debris Clearing and Removal
>
Responses
>
Phillips & Jordan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2011 4:15:19 PM
Creation date
3/25/2011 4:14:35 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Emergency Debris Clearing
Bid No. (xx-xx-xx)
08-07-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. 5.19. <br />. 5.19.1. <br />. 5.19.2. <br />. <br />. 5.19.3. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />'" <br /> <br />CONTRACTOR(S) PETROLEUM, OIL, LUBRICANT (POL) SPILLS <br /> <br />The Contractor(s) shall be responsible for reporting to the City Debris Manager and cleaning up all <br />petroleum, oil, lubricant (POL) spills caused by the Contractor(s)'s operations at no additional cost. <br /> <br />Immediate containment actions shall be taken as necessary to minimize effect of any spill or leak. Cleanup <br />shall be in accordance with applicable Federal and local laws and regulations. <br /> <br />Spills other than on-the-site shall be reported to the National Response Center, and the City Debris <br />Manager immediately following discovery. A written follow-up shall be submitted to the City Debris Manager <br />not later than 7 days after the initial report. The written report shall be in narrative fonn, and as a minimum <br />shall include the following: <br /> <br />. Description of the material spilled (including identity, quantity, etc.). <br />. Determination as to whether or not the amount spilled is EPAlState reportable, and when and to whom <br />it was reported. <br />. Exact time and location of spill, including description of the area involved. <br />· Receiving stream or waters. <br />. Cause of incident and equipment and personnel involved. <br />. Injuries or property damage. <br />. Duration of discharge. <br />. Containment procedures initiated. <br />. Summary of all communications the Contractor(s) has had with press or other officials. <br />. Description of cleanup procedures employed or to be employed at the site, including disposal location <br />of spill residue. <br />. Corrective actions taken to prevent reoccurrence of similar event. <br /> <br />END OF SECTION <br /> <br />35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.