My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Downrite Engineering Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 08-07-01 Emergency Debris Clearing and Removal
>
Responses
>
Downrite Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2011 4:20:17 PM
Creation date
3/25/2011 4:20:03 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Emergency Debris
Bid No. (xx-xx-xx)
08-07-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Part B - Hourly Prices <br /> <br />Equipment and Labor Rates <br />Equipment Type Typical Hourly Hourly Total <br /> Clearing Equipment Labor Hourly <br /> Crew Rate Rate Rate <br /> Makeup <br />Bobcat Loader 1 ,b11:: 'v, :1<:; nn $60.00 <br />Bucket Truck 2 <l:F.n nn 30.00 $90.00 <br />Chipper/Mulcher (8' throat) 3 $135.00 45.00 $180.00 <br />Chipper/Mulcher (12" throat) 3 :1A<:; nn <1:45.00 $:no 00 <br />Crew Foreman w/Cell Phone and Pickup 1 50.00 $20.00 $70.00 <br />Dump Truck, 18 CY-20 CY 1 50.00 $15.00 $65.00 <br />Dump Truck, 21 CY-30 CY 1 <1;75.00 :1<:; nn <1;90.00 <br />Grader w/12' Blade 1 $80.00 ;1ti.OO $95.00 <br />Hydraulic Excavator, 1.5 CY 1 $70.00 20.00 $90.00 <br />Hvdraulic Excavator, 2.5 CY 1 ton nn <1:20.00 <l:11n nn <br />Knuckleboom Loader 1 70.00 $20.00 $90.00 <br />Laborer w/Chain Saw 1 23.00 $25.00 $48.00 <br />Laborer w/small tools, traffic control, f1aa person 1 $2<:; nn <1:25.00 <1;50.00 <br />Lowboy Trailer wfrractor 3 $100.00 $50.00 $150.00 <br />Mobile Crane (Adequate for hanging Iimbsneanina trees) 1 -$120.00 $15.00 $135.00 <br />Operations Manager w/Cell Phone and Pickuo 1 $40.00 $35.00 $75.00 <br />Pickup Truck, 1/2 Ton 1 $40.00 $10.00 $50.00 <br />Traffic Control, Temoorarv SinQle Lane Closure 3 $150.00 $50.00 $200.00 <br />Tree Climber s/Chainsaw 1 $60.00 . $15.00 $75.00 <br />Wheel Loader, 2.5 CY. 950 or similar 1 $60.00 $15.00 $75.00 <br />Wheel Loader, 3.5 - 4.0 CY. 966 or similar 1 $70.00 $15.00 $85.00 <br />Wheel Loader, 4.5 CY, 980 or similar 1 $9<:; nn $15.00 $110.00 <br />Wheel Loader-Backhoe 1.0 - '.5 CY 1 $50.00 $10.00 $60.00 <br />Other - Please Ust <br /> <br />Notes: <br /> <br />Note 1. Total Time and Mal8r1al Prices shall Include all labor (operators, laborers, and supervisors), equipment and materials Including but not limited <br />to: supplies, equipment maintenance, repairs, repair parts, fuels, lubricants, cellular phones, transportation, trafflc control and housing, If required, <br />necessary to accompNsh the project <br /> <br />Note 2. Identify the EqulpmenllPer80nnel that COI18t1lute a Typical Clearing Crew In the column provided <br /> <br />The Contractor will provide 5 (number) of crews dedicated to perform the Work within the first 24 <br />hours following Notice to Proceed. <br /> <br />The Contractor will provide 10 (number) of crews dedicated to perform the Work within the first 48 <br />hours following Notice to Proceed. <br /> <br />45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.