Laserfiche WebLink
<br />Copyright 2002 AlA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />2. Submit the Schedule of Values to Architect at earliest possible date but no later than <br />seven days before the date scheduled for submittal of initial Applications for Payment <br />3. Subschedules: Where the Work is separated into phases requiring separately phased <br />payments, provide sub schedules showing values correlated with each phase of payment <br /> <br />B. Format and Content: Use the Project Manual table of contents as a guide to establish line items <br />for the Schedule of Values. Provide at least one line item for each Specification Section. <br /> <br />1. Identification: Include the following Project identification on the Schedule of Values: <br /> <br />a. Project name and location. <br />b. Name of Architect <br />c. Architect's project number. <br />d. Contractor's name and address. <br />e. Date of submittal. <br /> <br />2. Submit draft of AlA Document G703 Continuation Sheets. <br />3. Arrange the Schedule of Values in tabular form with separate columns to indicate the <br />following for each item listed: <br /> <br />a. Related Specification Section or Division. <br />b. Description of the Work. <br />c. Name of subcontractor. <br />d. Name of manufacturer or fabricator. <br />e. Name of supplier. <br />f. Change Orders (numbers) that affect value. <br />g. Dollar value. <br /> <br />1) Percentage of the Contract Sum to nearest one-hundredth percent, adjusted <br />to total 1 00 percent <br /> <br />4. Provide a breakdown of the Contract Sum in enough detail to facilitate continued <br />evaluation of Applications for Payment and progress reports. Coordinate with the Project <br />Manual table of contents. Provide several line items for principal subcontract amounts, <br />where appropriate. Include separate line items under required principal subcontracts for <br />operation and maintenance manuals, punch list activities, Project Record Documents, and <br />demonstration and training in the amount of 5 percent of the Contract Sum. <br />5. Round amounts to nearest whole dollar; total shall equal the Contract Sum. <br />6. Provide a separate line item in the Schedule of Values for each part of the Work where <br />Applications for Payment may include materials or equipment purchased or fabricated <br />and stored, but not yet installed. <br /> <br />a. Differentiate between items stored on-site and items stored off-site. If specified, <br />include evidence of insurance or bonded warehousing. <br /> <br />7. Provide separate line items in the Schedule of Values for initial cost of materials, for each <br />subsequent stage of completion, and for total installed value of that part of the Work. <br />8. Allowances: Provide a separate line item in the Schedule of Values for each allowance. <br />Show line-item value of unit-cost allowances, as a product of the unit cost, multiplied by <br />measured quantity. Use information indicated in the Contract Documents to determine <br />quantities. <br /> <br />PAYMENT PROCEDURES <br /> <br />01290 - 2 <br />