Laserfiche WebLink
<br />Copyright 2002 AlA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />SECTION 01322 - PHOTOGRAPHIC DOCUMENTATION <br /> <br />PART 1 - GENERAL <br /> <br />1.1 RELATED DOCUMENTS <br /> <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 1 Specification Sections, apply to this Section. <br /> <br />1.2 SUMMARY <br /> <br />A. This Section includes administrative and procedural requirements for the following: <br /> <br />1. Preconstruction photographs. <br />2. Periodic construction photographs. <br />3. Final Completion construction photographs. <br />4. Preconstruction videotapes. <br />5. Periodic construction videotapes. <br />6. Time-lapse sequence construction videotapes. <br /> <br />B. Related Sections include the following: <br /> <br />1. Division 1 Section "Alloyvances" for requirements for photographic documentation <br />provided under an allowance. <br />2. Division 1 Section "Unit Prices" for procedures for unit prices for extra photographs. <br />3. Division 1 Section "Submittal Procedures" for submitting photographic documentation. <br />4. Division 1 Section "Selective Demolition" for photographic documentation before <br />selective demolition operations commence. <br />5. Division 1 Section "Closeout Procedures" for submitting digital media as Project Record <br />Documents at Project closeout. <br />6. Division 1 Section "Demonstration and Training" for submitting videotapes of <br />demonstration of equipment and training of Owner's personnel. <br />7. Division 2 Section "Building Demolition" for photographic documentation before <br />building demolition operations commence. <br /> <br />1.3 ALLOWANCE <br /> <br />A. Costs: Photographer's services are included under the cash allowance for construction <br />photographs established in Division 1 Section "Allowances." <br /> <br />1.4 UNIT PRICES <br /> <br />A. Basis for Bids; Base number of construction photographs on twelve photographs per week over <br />the duration of Project. <br /> <br />PHOTOGRAPHIC DOCUMENTATION <br /> <br />01322 - 1 <br />