Laserfiche WebLink
<br />~ <br /> <br />Advancement <br />of Construction <br />Technology <br /> <br />SUBMITTAL <br />TRANSMITTAL <br /> <br />Project: <br /> <br />Date: <br /> <br />AlE Project Number: <br /> <br />TRANSMITTAL To (Contractor): <br /> <br />Date: <br /> <br />Submittal No. <br /> <br />A <br /> <br />From (Subcontractor): <br /> <br />By: <br /> <br />o Resubmission <br /> <br />Qty. <br /> <br />Reference / <br />Number <br /> <br />Title / Description / <br />Manufacturer <br /> <br />Spec. Section Title and Paragraph / <br />Drawin2 Detail Reference <br /> <br />Other remarks on above submission: <br /> <br />o Substitution involved - Substitution request attached <br />o If substitution involved, submission includes point-by-point <br />comparative data or preliminary details <br />o Items included in submission will be ordered <br />immediately upon receipt of approval <br /> <br />o One copy retained by sender <br /> <br />o Submitted for review and approval <br />o Resubmitted for review and approval <br />o Complies with contract requirements <br />o Will be available to meet construction schedule <br />o AlE review time included in construction schedule <br /> <br />TRANSMITTAL To (AlE): <br /> <br />Attn: <br /> <br />Date Rec'd by Contractor: <br /> <br />B <br /> <br />From (Contractor): <br /> <br />By: <br /> <br />Date Trnsmt'd by Contractor: <br /> <br />o Approved <br />o Approved as noted <br /> <br />o Revise / Resubmit <br />o Rejected / Resubmit <br /> <br />Other remarks on above submission: <br /> <br />o One copy retained by sender <br /> <br />TRANSMITTAL To (Contractor): <br /> <br />Attn: <br /> <br />Date Rec'd by AlE: <br /> <br />c <br /> <br />From (AlE): <br /> <br />o Other <br /> <br />By: <br /> <br />Date Trnsmt'd by AlE: <br /> <br />o Approved <br />o Approved as noted <br />o Not subject to review <br />o No action required <br />o Revise / Resubmit <br />o Rejected / Resubmit <br />o Approved as noted / Resubmit <br /> <br />o Provide file copy with corrections identified <br />o Sepia copies only returned <br /> <br />o Point-by-point comparative data required <br />to complete approval process <br /> <br />Other remarks on above submission: <br /> <br />o Submission Incomplete / Resubmit <br />o One copy retained by sender <br /> <br />TRANSMITTAL To (Subcontractor): <br /> <br />Attn: <br /> <br />Date Rec'd by Contractor: <br /> <br />D <br /> <br />From (Contractor): <br /> <br />By: <br /> <br />Date Trnsmt'd by Contractor: <br /> <br />Copies: 0 Owner <br /> <br />o Consultants <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o One copy retained by sender <br /> <br />Copyright 1996, Construction Specifications Institute, <br />106 Madison Street, Alexandria, VA 22314-1791 <br /> <br />Page of <br /> <br />September 1996 <br />CS1 Form 12.1A <br />