Laserfiche WebLink
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />SECTION 01330 - SUBMITIAL PROCEDURES <br /> <br />PART 1 - GENERAL <br /> <br />1.1 RELATED DOCUMENTS <br /> <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 1 Specification Sections, apply to this Section. <br /> <br />1.2 SUMMARY <br /> <br />A. This Section includes administrative and procedural requirements for submitting Shop <br />Drawings, Product Data, Samples, and other submittals. <br /> <br />B. Related Sections include the following: <br /> <br />1. Division 1 Section "Payment Procedures" for submitting Applications for Payment and <br />the Schedule of Values. <br />2. Division 1 Section "Project Management and Coordination" for submitting and <br />distributing meeting and conference minutes and for submitting Coordination Drawings. <br />3. Division 1 Section "Construction Progress Documentation" for submitting schedules and <br />reports, including Contractor's Construction Schedule and the Submittals Schedule. <br />4. Division 1 Section "Photographic Documentation" for submitting construction <br />photographs. <br />5. Division 1 Section "Quality Requirements" for submitting test and inspection reports and <br />for mockup requirements. <br />6. Division 1 Section "Closeout Procedures" for submitting warranties. <br />7. Division 1 Section "Project Record Documents" for submitting Record Drawings, Record <br />Specifications, and Record Product Data. <br />8. Division 1 Section "Operation and Maintenance Data" for submitting operation and <br />maintenance manuals. <br />9. Division 1 Section "Demonstration and Training" for submitting videotapes of <br />demonstration of equipment and training of Owner's personnel. <br />10. Divisions 2 through 16 Sections for specific requirements for submittals in those <br />Sections. <br /> <br />1.3 DEFINITIONS <br /> <br />A. Action Submittals: Written and graphic information that requires Architect's responsive action. <br /> <br />B. Informational Submittals: Written information that does not require Architect's responsive <br />action. Submittals may be rejected for not complying with requirements. <br /> <br />SUBMITTAL PROCEDURES <br /> <br />01330 - 1 <br />