My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />To comply with these requirements, indicated numeric values are minimum or maximum, as <br />appropriate, for the context of requirements. Refer uncertainties to Architect for a decision <br />before proceeding. <br /> <br />1.5 SUBMITTALS <br /> <br />A. Qualification Data: For testing agencies specified in "Quality Assurance" Article to <br />demonstrate their capabilities and experience. Include proof of qualifications in the form of a <br />recent report on the inspection of the testing agency by a recognized authority. <br /> <br />B. Schedule of Tests and Inspections: Prepare in tabular form and include the following: <br /> <br />1. Specification Section number and title. <br />2. Description of test and inspection. <br />3. Identification of applicable standards. <br />4. Identification of test and inspection methods. <br />5. Number of tests and inspections required. <br />6. Time schedule or time span for tests and inspections. <br />7. Entity responsible for performing tests and inspections. <br />8. Requirements for obtaining samples. <br />9. Unique characteristics of each quality-control service. <br /> <br />C. Reports: Prepare and submit certified written reports that include the following: <br /> <br />1. Date of issue. <br />2. Project title and number. <br />3. Name, address, and telephone number of testing agency. <br />4. Dates and locations of samples and tests or inspections. <br />5. Names of individuals making tests and inspections. <br />6. Description of the Work and test and inspection method. <br />7. Identification of product and Specification Section. <br />8. Complete test or inspection data. <br />9. Test and inspection results and an interpretation of test results. <br />10. Record of temperature and weather conditions at time of sample taking and testing and <br />inspecting. <br />11. Comments or professional opinion on whether tested or inspected Work complies with <br />the Contract Document requirements. <br />12. Name and signature of laboratory inspector. <br />13. Recommendations on retesting and reinspecting. <br /> <br />D. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, <br />certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee <br />payments, judgments, correspondence, records, and similar documents, established for <br />compliance with standards and regulations bearing on performance of the Work. <br /> <br />1.6 QUALITY ASSURANCE <br /> <br />A. General: Qualifications paragraphs in this Article establish the minimum qualification levels <br />required; individual Specification Sections specify additional requirements. <br /> <br />QUALITY REQUIREMENTS <br /> <br />01400 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.