My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />d. Build site-assembled test assemblies and mockups usmg installers who will <br />perform same tasks for Project. <br />e. Build laboratory mockups at testing facility using personnel, products, and <br />methods of construction indicated for the completed Work. <br />f. When testing is complete, remove test specimens, assemblies, mockups, and <br />laboratory mockups; do not reuse products on Project. <br /> <br />2. Testing Agency Responsibilities: Submit a certified written report of each test, <br />inspection, and similar quality-assurance service to Architect, through Construction <br />Manager, with copy to Contractor. Interpret tests and inspections and state in each report <br />whether tested and inspected work complies with or deviates from the Contract <br />Documents. <br /> <br />J. Mockups: Before installing portions of the Work requiring mockups, build mockups for each <br />form of construction and finish required to comply with the following requirements, using <br />materials indicated for the completed Work: <br /> <br />1. Build mockups in location and of size indicated or, if not indicated, as directed by <br />Architect or Construction Manager. <br />2. Notify Architect and Construction Manager seven days in advance of dates and times <br />when mockups will be constructed. <br />3. Demonstrate the proposed range of aesthetic effects and workmanship. <br />4. Obtain Architect's and Construction Manager's approval of mockups before starting <br />work, fabrication, or construction. <br /> <br />a. Allow seven days for initial review and each re-review of each mockup. <br /> <br />5. Maintain mockups during construction in an undisturbed condition as a standard for <br />judging the completed Work. <br />6. Demolish and remove mockups when directed, unless otherwise indicated. <br /> <br />K. Laboratory Mockups: Comply with requirements of preconstruction testing and those specified <br />in individual Sections in Divisions 2 through 16. <br /> <br />1.7 QUALITY CONTROL <br /> <br />A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, <br />Owner will engage a qualified testing agency to perform these services. <br /> <br />1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing <br />agencies engaged and a description of types of testing and inspecting they are engaged to <br />perform. <br />2. Payment for these services will be made from testing and inspecting allowances, as <br />authorized by Change Orders. <br />3. Costs for retesting and reinspecting construction that replaces or is necessitated by work <br />that failed to comply with the Contract Documents will be charged to Contractor, and the <br />Contract Sum will be adjusted by Change Order. <br /> <br />B. Tests and inspections not explicitly assigned to Owner are Contractor's responsibility. Unless <br />otherwise indicated, provide quality-control services specified and those required by authorities <br /> <br />QUALITY REQUIREMENTS <br /> <br />01400 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.