Laserfiche WebLink
<br />Copyright 2002 AlA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />PART 2 - PRODUCTS (Not Used) <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 TEST AND INSPECTION LOG <br /> <br />A. Prepare a record of tests and inspections. Include the following: <br /> <br />1. Date test or inspection was conducted. <br />2. Description of the Work tested or inspected. <br />3. Date test or inspection results were transmitted to Architect. <br />4. Identification of testing agency or special inspector conducting test or inspection. <br /> <br />B. Maintain log at Project site. Post changes and modifications as they occur. Provide access to <br />test and inspection log for Architect's and Construction Manager's reference during normal <br />working hours. <br /> <br />3.2 REPAIR AND PROTECTION <br /> <br />A. General: On completion of testing, inspecting, sample taking, and similar services, repair <br />damaged construction and restore substrates and fInishes. <br /> <br />1. Provide materials and comply with installation requirements specified in other <br />Specification Sections. Restore patched areas and extend restoration into adjoining areas <br />with durable seams that are as invisible as possible. <br />2. Comply with the Contract Document requirements for Division 1 Section "Cutting and <br />Patching. " <br /> <br />B. Protect construction exposed by or for quality-control service activities. <br /> <br />C. Repair and protection are Contractor's responsibility, regardless of the assignment of <br />responsibility for quality-control services. <br /> <br />END OF SECTION 01400 <br /> <br />QUALITY REQUIREMENTS <br /> <br />01400 - 8 <br />