My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />4. Provide temporary standpipes and hoses for fire protection. Hang hoses with a warning <br />sign stating that hoses are for fITe-protection purposes only and are not to be removed. <br />Match hose size with outlet size and equip with suitable nozzles. <br /> <br />3.5 OPERATION, TERMINATION, AND REMOVAL <br /> <br />A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and <br />abuse, limit availability of temporary facilities to essential and intended uses. <br /> <br />B. Maintenance: Maintain facilities in good operating condition until removal. <br /> <br />1. Maintain operation of temporary enclosures, heating, cooling, humidity control, <br />ventilation, and similar facilities on a 24-hour basis where required to achieve indicated <br />results and to avoid possibility of damage. <br /> <br />C. Operate Project-identification-sign lighting daily from dusk until 12:00 midnight. <br /> <br />D. Temporary Facility Crumgeover: Do not change over from using temporary security and <br />protection facilities to permanent facilities until Substantial Completion. <br /> <br />E. Termination and Removal: Remove each temporary facility when need for its service has <br />ended, when it has been replaced by authorized use of a permanent facility, or no later than <br />Substantial Completion. Complete or, if necessary, restore permanent construction that may <br />have been delayed because of interference with temporary facility. Repair damaged Work, <br />clean exposed surfaces, lmd replace construction that cannot be satisfactorily repaired. <br /> <br />I. Materials and facilities that constitute temporary facilities are property of Contractor. <br />Owner reserves right to take possession of Project identification signs. <br />2. Remove tempormy paving not intended for or acceptable for integration into permanent <br />paving. Where area is intended for landscape development, remove soil and aggregate <br />fIll that do not comply with requirements for fIll or subsoil. Remove materials <br />contaminated with road oil, asphalt and other petrochemical compounds, and other <br />substances that might impair growth of plant materials or lawns. Repair or replace street <br />paving, curbs, and sidewalks at temporary entrances, as required by authorities having <br />jurisdiction. <br />3. At Substantial Completion, clean and renovate permanent facilities used during <br />construction period. Comply with fInal cleaning requirements specified in Division 1 <br />Section "Closeout Procedures." <br /> <br />END OF SECTION 01500END OF SECTION 01500 <br /> <br />TEMPORARY FACILITIES AND CONTROLS <br /> <br />01500 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.