Laserfiche WebLink
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />C. Basis-of-Design Product Specification: Where a specific manufacturer's product is named and <br />accompanied by the words "basis of design," including make or model number or other <br />designation, to establish the significant qualities related to type, function, dimension, in-service <br />performance, physical properties, appearance, and other characteristics for purposes of <br />evaluating comparable products of other named manufacturers. <br /> <br />1.4 SUBMITTALS <br /> <br />A. Product List: Submit a list, in tabular from, showing specified products. Include generic names <br />of products required. lnclude manufacturer's name and proprietary product names for each <br />product. <br /> <br />1. Coordinate product list with Contractor's Construction Schedule and the Submittals <br />Schedule. <br />2. Form: Tabulate information for each product under the following column headings: <br /> <br />a. Specification Section number and title. <br />b. Generic name used in the Contract Documents. <br />c. Proprietary name, model number, and similar designations. <br />d. Manufacturer's name and address. <br />e. Supplier's name and address. <br />f. Installer's name and address. <br />g. Projected delivery date or time span of delivery period. <br />h. Identification of items that require early submittal approval for scheduled delivery <br />date. <br /> <br />3. Initial Submittal: Within 30 days after date of commencement of the Work, submit 3 <br />copies of initial product list. Include a written explanation for omissions of data and for <br />variations from Contract requirements. <br /> <br />a. At Contractor's option, initial submittal may be limited to product selections and <br />designations that must be established early in Contract period. <br /> <br />4. Completed List: Within 60 days after date of commencement of the Work, submit 3 <br />copies of completed product list. Include a written explanation for omissions of data and <br />for variations from Contract requirements. <br />5. Architect's Action: Architect will respond in writing to Contractor within 15 days of <br />receipt of completed product list. Architect's response will include a list of unacceptable <br />product selectioru: and a brief explanation of reasons for this action. Architect's response, <br />or lack of response, does not constitute a waiver of requirement to comply with the <br />Contract Documents. <br /> <br />B. Substitution Requests: Submit three copies of each request for consideration. Identify product <br />or fabrication or installation method to be replaced. Include Specification Section number and <br />title and Drawing numbers and titles. <br /> <br />1. Substitution Request Form: Use CSI Form 13.1A. <br />2. Documentation: Show compliance with requirements for substitutions and the following, <br />as applicable: <br /> <br />PRODUCT REQUIREMENTS <br /> <br />01600 - 2 <br />