My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />E. Predemolition Conference: Conduct conference at Project site to comply with requirements in <br />Division 1 Section "Project Management and Coordination." <br /> <br />F. Predemolition Conference: Conduct conference at Project site to comply with requirements in <br />Division 1 Section "Project Management and Coordination." Review methods and procedures <br />related to selective demolition including, but not limited to, the following: <br /> <br />1. Inspect and discuss condition of construction to be selectively demolished. <br />2. Review structural load limitations of existing structure. <br />3. Review and finalize selective demolition schedule and verify availability of materials, <br />demolition personnel, equipment, and facilities needed to make progress and avoid <br />delays. <br />4. Review requirements of work performed by other trades that rely on substrates exposed <br />by selective demolition operations. <br />5. Review areas where existing construction is to remain and requires protection. <br /> <br />1.7 PROJECT CONDITIONS <br /> <br />A. Owner will occupy portions of building immediately adjacent to selective demolition area. <br />Conduct selective demolition so Owner's operations will not be disrupted. <br /> <br />1. Comply with requirements specified in Division 1 Section "Summary." <br /> <br />B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as <br />far as practical. <br /> <br />C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding <br />with selective demolition. <br /> <br />D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the <br />Work. <br /> <br />1. If materials suspected of containing hazardous materials are encountered, do not disturb; <br />immediately notify Architect and Owner. Owner will remove hazardous materials under <br />a separate contract. <br /> <br />E. Hazardous Materials: It is unknown whether hazardous materials will be encountered in the <br />Work. <br /> <br />1. If materials suspected of containing hazardous materials are encountered, do not disturb; <br />immediately notify Architect and Owner. Owner will remove hazardous materials under <br />a separate contract. <br /> <br />F. Hazardous Materials: Hazardous materials are present in construction to be selectively <br />demolished. A report on the presence of hazardous materials is on file for review and use. <br />Examine report to become aware of locations where hazardous materials are present. <br /> <br />1. Hazardous material remediation is specified elsewhere in the Contract Documents. <br /> <br />SELECTIVE DEMOLITION <br /> <br />01732-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.