Laserfiche WebLink
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (R 05/06) <br /> <br />E. Predemolition Conference: Conduct conference at Project site to comply with requirements in <br />Division 1 Section "Project Management and Coordination." <br /> <br />F. Predemolition Conference: Conduct conference at Project site to comply with requirements in <br />Division 1 Section "Project Management and Coordination." Review methods and procedures <br />related to selective demolition including, but not limited to, the following: <br /> <br />1. Inspect and discuss condition of construction to be selectively demolished. <br />2. Review structural load limitations of existing structure. <br />3. Review and finalize selective demolition schedule and verify availability of materials, <br />demolition personnel, equipment, and facilities needed to make progress and avoid <br />delays. <br />4. Review requirements of work performed by other trades that rely on substrates exposed <br />by selective demolition operations. <br />5. Review areas where existing construction is to remain and requires protection. <br /> <br />1.7 PROJECT CONDITIONS <br /> <br />A. Owner will occupy portions of building immediately adjacent to selective demolition area. <br />Conduct selective demolition so Owner's operations will not be disrupted. <br /> <br />1. Comply with requirements specified in Division 1 Section "Summary." <br /> <br />B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as <br />far as practical. <br /> <br />C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding <br />with selective demolition. <br /> <br />D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the <br />Work. <br /> <br />1. If materials suspected of containing hazardous materials are encountered, do not disturb; <br />immediately notify Architect and Owner. Owner will remove hazardous materials under <br />a separate contract. <br /> <br />E. Hazardous Materials: It is unknown whether hazardous materials will be encountered in the <br />Work. <br /> <br />1. If materials suspected of containing hazardous materials are encountered, do not disturb; <br />immediately notify Architect and Owner. Owner will remove hazardous materials under <br />a separate contract. <br /> <br />F. Hazardous Materials: Hazardous materials are present in construction to be selectively <br />demolished. A report on the presence of hazardous materials is on file for review and use. <br />Examine report to become aware of locations where hazardous materials are present. <br /> <br />1. Hazardous material remediation is specified elsewhere in the Contract Documents. <br /> <br />SELECTIVE DEMOLITION <br /> <br />01732-3 <br />