My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />SECTION 01770 - CLOSEOUT PROCEDURES <br /> <br />PART I-GENERAL <br /> <br />1.1 <br /> <br />RELATED DOCUMENTS <br /> <br />A. <br /> <br />Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 1 Specification Sections, apply to this Section. <br /> <br />1.2 <br /> <br />SUMMARY <br /> <br />A. <br /> <br />This Section includes administrative and procedural requirements for contract closeout, <br />including, but not limited to, the following: <br /> <br />1. Inspection procedures. <br />2. Warranties. <br />3. Final cleaning. <br /> <br />B. Related Sections include the following: <br /> <br />1. Division 1 Section "Payment Procedures" for requirements for Applications for Payment <br />for Substantial and Final Completion. <br />2. Division I Section "Photographic Documentation" for submitting Final Completion <br />construction photographs and negatives. <br />3. Division 1 Section "Execution Requirements" for progress cleaning of Project site. <br />4. Division 1 Section "Project Record Documents" for submitting Record Drawings, Record <br />Specifications, and Record Product Data. <br />5. Division 1 Section "Operation and Maintenance Data" for operation and maintenance <br />manual requirements. <br />6. Division 1 Section "Demonstration and Training" for requirements for instructing <br />Owner's personnel. <br />7. Divisions 2 through 16 Sections for specific closeout and special cleaning requirements <br />for the Work in those Sections. <br /> <br />1.3 SUBSTANTIAL COMPLETION <br /> <br />A. Preliminary Procedures: Before requesting inspection for determining date of Substantial <br />Completion, complete the following. List items below that are incomplete in request. <br /> <br />1. Prepare a list of items to be completed and corrected (punch list), the value of items on <br />the list, and reasons why the Work is not complete. <br />2. Advise Owner of pending insurance changeover requirements. <br />3. Submit specific warranties, workmanship bonds, maintenance service agreements, final <br />certifications, and similar documents. <br />4. Obtain and submit releases permitting Owner unrestricted use of the Work and access to <br />services and utilities. Include occupancy permits, operating certificates, and similar <br />releases. <br /> <br />CLOSEOUT PROCEDURES <br /> <br />01770-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.