My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />or will notify Contractor of construction that must be completed or corrected before certificate <br />will be issued. <br /> <br />I. Reinspection: Request reinspection when the Work identified in previous inspections as <br />incomplete is completed or corrected. <br /> <br />1.5 LIST OF INCOMPLETE ITEMS (PUNCH LIST) <br /> <br />A. Preparation: Submit three copies of list. Include name and identification of each space and area <br />affected by construction operations for incomplete items and items needing correction <br />including, if necessary, areas disturbed by Contractor that are outside the limits of construction. <br />Use CSI Form 14.1A. <br /> <br />1. Organize list of spaces in sequential order, starting with exterior areas fIrst and <br />proceeding from lowest floor to highest floor. <br />2. Organize items applying to each space by major element, including categories for ceiling, <br />individual walls, floors, equipment, and building systems. <br />3. Include the following information at the top of each page: <br /> <br />a. Project name. <br />b. Date. <br />c. Name of Architect and Construction Manager. <br />d. Name of Contractor. <br />e. Page number. <br /> <br />1.6 WARRANTIES <br /> <br />A. Submittal Time: Submit written warranties on request of Architect for designated portions of <br />the Work where commencement of warranties other than date of Substantial Completion is <br />indicated. <br /> <br />B. Partial Occupancy: Submit properly executed warranties within 15 days of completion of <br />designated portions of the Work that are completed and occupied or used by Owner during <br />construction period by separate agreement with Contractor. <br /> <br />C. Organize warranty documents into an orderly sequence based on the table of contents of the <br />Proj ect Manual. <br /> <br />1. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, <br />thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-l1-inch <br />(215-by-280-mm) paper. <br />2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark <br />tab to identify the product or installation. Provide a typed description of the product or <br />installation, including the name of the product and the name, address, and telephone <br />number of Installer. <br />3. Identify each binder on the front and spine with the typed or printed title <br />"WARRANTIES," Project name, and name of Contractor. <br /> <br />D. Provide additional copies of each warranty to include in operation and maintenance manuals. <br /> <br />CLOSEOVTPROCEDURES <br /> <br />01770 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.