My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />1. Touch up and otherwise repair and restore marred, exposed fInishes and surfaces. <br />Replace fInishes and surfaces that cannot be satisfactorily repaired or restored or <br />that already show evidence of repair or restoration. <br /> <br />I) Do not paint over "UL" and similar labels, including mechanical and <br />electrical nameplates. <br /> <br />m. Wipe surfaces of mechanical and electrical equipment, and similar equipment. <br />Remove excess lubrication, paint and mortar droppings, and other foreign <br />substances. <br />n. Replace parts subject to unusual operating conditions. <br />o. Clean plumbing fixtures to a sanitary condition, free of stains, including stains <br />resulting from water exposure. <br />p. Replace disposable air filters and clean permanent air filters. Clean exposed <br />surfaces of diffusers, registers, and grills. <br />q. Clean ducts, blowers, and coils if units were operated without filters during <br />construction. <br />r. Clean light fIxtures, lamps, globes, and reflectors to function with full efficiency. <br />Replace burned-out bulbs, and those noticeably dimmed by hours of use, and <br />defective and noisy starters in fluorescent and mercury vapor fixtures to comply <br />with requirements for new fixtures. <br />s. Leave Project clean and ready for occupancy. <br /> <br />C. Pest Control: Engage an experienced, licensed exterminator to make a final inspection and rid <br />Project of rodents, insects, and other pests. Prepare a report. <br /> <br />D. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or <br />excess materials on Owner's property. Do not discharge volatile, harmful, or dangerous <br />materials into drainage systems. Remove waste materials from Project site and dispose of <br />lawfully. <br /> <br />END OF SECTION 01770 <br /> <br />CLOSEOUTPROCEDVRES <br /> <br />01770 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.