My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />SECTION 01782 - OPERATION AND MAINTENANCE DATA <br /> <br />PART 1 - GENERAL <br /> <br />1.1 RELATED DOCUMENTS <br /> <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 1 Specification Sections, apply to this Section. <br /> <br />1.2 SUMMARY <br /> <br />A. This Section includes administrative and procedural requirements for preparing operation and <br />maintenance manuals, including the following: <br /> <br />1. Operation and maintenance documentation directory. <br />2. Emergency manuals. <br />3. Operation manuals for systems, subsystems, and equipment. <br />4. Maintenance manuals for the care and maintenance of products, materials, and finishes, <br />systems and equipment. <br /> <br />B. Related Sections include the following: <br /> <br />1. Division 1 Section "Summary of Multiple Contracts" for coordinating operation and <br />maintenance manuals covering the Work of multiple contracts. <br />2. Division 1 Section "Submittal Procedures" for submitting copies of submittals for <br />operation and maintenance manuals. <br />3. Division 1 Section "Closeout Procedures" for submitting operation and maintenance <br />manuals. <br />4. Division 1 Section "Project Record Documents" for preparing Record Drawings for <br />operation and maintenance manuals. <br />5. Divisions 2 through 16 Sections for specific operation and maintenance manual <br />requirements for the Work in those Sections. <br /> <br />1.3 DEFINITIONS <br /> <br />A. System: An organized collection of parts, equipment, or subsystems united by regular <br />interaction. <br /> <br />B. Subsystem: A portion of a system with characteristics similar to a system. <br /> <br />1.4 SUBMITTALS <br /> <br />A. Initial Submittal: Submit 2 draft copies of each manual at least 15 days before requesting <br />inspection for Substantial Completion. Include a complete operation and maintenance <br />directory. Architect will return one copy of draft and mark whether general scope and content <br />of manual are acceptable. <br /> <br />OPERATION AND MAINTENANCE DATA <br /> <br />01782 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.