My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />1. Product name and model number. <br />2. Manufacturer's name. <br />3. Equipment identification with serial number of each component. <br />4. Equipment function. <br />5. Operating characteristics. <br />6. Limiting conditions. <br />7. Performance curves. <br />8. Engineering data and tests. <br />9. Complete nomenclature and number of replacement parts. <br /> <br />C. Operating Procedures: Include the following, as applicable: <br /> <br />I. Startup procedures. <br />2. Equipment or system break-in procedures. <br />3. Routine and normal operating instructions. <br />4. Regulation and control procedures. <br />5. Instructions on stopping. <br />6. Normal shutdown instructions. <br />7. Seasonal and weekend operating instructions. <br />8. Required sequences for electric or electronic systems. <br />9. Special operating instructions and procedures. <br /> <br />D. <br /> <br />Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as <br />installed. <br /> <br />E. <br /> <br />Piped Systems: Diagram piping as installed, and identify color-coding where required for <br />identification. <br /> <br />2.5 <br /> <br />PRODUCT MAINTENANCE MANUAL <br /> <br />A. <br /> <br />Content: Organize manual into a separate section for each product, material, and finish. <br />Include source information, product information, maintenance procedures, repair materials and <br />sources, and warranties and bonds, as described below. <br /> <br />B. <br /> <br />Source Information: List each product included in manual, identified by product name and <br />arranged to match manual's table of contents. For each product, list name, address, and <br />telephone number of Installer or supplier and maintenance service agent, and cross-reference <br />Specification Section number and title in Project Manual. <br /> <br />C. <br /> <br />Product Information: Include the following, as applicable: <br /> <br />1. Product name and model number. <br />2. Manufacturer's name. <br />3. Color, pattern, and texture. <br />4. Material and chemical composition. <br />5. Reordering information for specially manufactured products. <br /> <br />D. Maintenance Procedures: Include manufacturer's written recommendations and the following: <br /> <br />1. Inspection procedures. <br /> <br />OPERATION AND MAINTENANCE DATA <br /> <br />01782 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.