My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2003 AIA <br /> <br />MASTERSPEC Short Form <br /> <br />11/03 (R 05/06) <br /> <br />c. Absorptive cover, water saturated and kept continuously wet. Cover concrete <br />surfaces and edges with 12-inch (300-mm) lap over adjacent absorptive covers. <br /> <br />2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining <br />cover for curing concrete, placed in widest practicable width, with sides and ends lapped <br />at least 12 inches (300 mm), and sealed by waterproof tape or adhesive. Cure for not less <br />than seven days. Immediately repair any holes or tears during curing period using cover <br />material and waterproof tape. <br />3. Curing Compound: Apply uniformly in continuous operation by power spray or roller <br />according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall <br />within three hours after initial application. Maintain continuity of coating and repair <br />damage during curing period. <br />4. Curing and Sealing Compound: Apply uniformly to floors and slabs indicated in a <br />continuous operation by power spray or roller according to manufacturer's written <br />instructions. Recoat areas subjected to heavy rainfall within three hours after initial <br />application. Repeat process 24 hours later and apply a second coat. Maintain continuity <br />of coating and repair damage during curing period. <br /> <br />3.9 FIELD QUALITY CONTROL <br /> <br />A. Testing Agency: [Owner will engage] [Engage] a qualified independent testing and inspecting <br />agency to sample materials, perform tests, and submit test reports during concrete placement <br />according to requirements specified in this Article. <br /> <br />B. Tests: Perform according to ACI 301. <br /> <br />3.1 0 REPAIRS <br /> <br />A. Remove and replace concrete that does not comply with requirements in this Section. <br /> <br />END OF SECTION 03301 END OF SECTION 03301 <br /> <br />CAST-IN-PLACE CONCRETE (LIMITED APPLICATIONS) <br /> <br />03301 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.