My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2003 AIA <br /> <br />MASTERSPEC - SHORT FORM <br /> <br />05/03 <br /> <br />1. Install insulation board in a stair-step configuration with a maximum step-down of 1 inch <br />(25 mm). <br /> <br />C. Deposit and screed lightweight insulating concrete in a continuous operation until an entire <br />panel or section of roof area is completed. Do not vibrate or work mix except for screeding or <br />floating. Place to depths and slopes indicated. <br /> <br />D. Finish top surface smooth, free of ridges and depressions, and maintain surface in condition to <br />receive subsequent roofmg system. <br /> <br />E. Begin curing operations immediately after placement, and air cure for not less than three days <br />according to manufacturer's written instructions. <br /> <br />F. If ambient temperature falls below 32 deg F (0 deg C), protect lightweight insulating concrete <br />from freezing and maintain temperature recommended by manufacturer for 72 hours after <br />placement. <br /> <br />END OF SECTION 03521 <br /> <br />LIGHTWEIGHT INSULATING CONCRETE <br /> <br />03521 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.