My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC - SHORT FORM <br /> <br />11/02 <br /> <br />E. Prepare joints and apply sealant of type and at locations indicated to comply with applicable <br />requirements in Division 7 Section "Joint Sealants." <br /> <br />3.3 INSTALLATION TOLERANCES <br /> <br />A. Variation from Plumb: Do not exceed 1/8 inch in 10 fcct (3 mm in 3 m), 1/4 inch in 20 feet (6 <br />nlm in 6 m), or 1/2 inch (12 mm) maximum. <br /> <br />B. Variation from Level: Do not exceed 118 inch in 10 feet (3 mm in 3 m), 1/4 inch in 20 feet (6 <br />mm in 6 m), or 1/2 inch (12 mm) maximum. <br /> <br />C. Variation in Joint Width: Do not vary joint thickness more than 1/8 inch in 36 inches (3 mm in <br />900 mm) or one-fourth of nominal joint width, whichever is less. <br /> <br />D. Variation in Plane between Adjacent Surfaces (Lipping): Do not vary from flush alignment <br />with adjacent units or adjacent surfaces indicated to be flush with units by more than 1/16 inch <br />(1.5 mm), except due to warpage of units. <br /> <br />3.4 ADJUSTING AND CLEANING <br /> <br />A. Remove and replace stained and otherwise damaged units and units not matching approved <br />Samples. Cast stone may be repaired if methods and results are approved by Architect. <br /> <br />1. Replace units in a manner that shows no evidence of replacement. <br /> <br />B. In-Progress Cleaning: Clean cast stone as work progresses. <br /> <br />1. Remove mortar fIns and smears before tooling joints. <br />2. Remove excess sealant immediately, including spills, smears, and spatter. <br /> <br />C. Final Cleaning: After mortar is thoroughly set and cured, clean exposed cast stone to comply <br />with requirements in Division 4 Section "Unit Masonry Assemblies." <br /> <br />END OF SECTION 04720 <br /> <br />CAST STONE <br /> <br />04720 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.