Laserfiche WebLink
<br />Copyright 2003 AIA <br /> <br />MASTERSPEC Short Form <br /> <br />05103 (R 05106) <br /> <br />2. Space, adjust, and align joists accurately in location before permanently fastening. <br />3. Install temporary bracing and erection bridging, connections, and anchors to ensure that <br />joists are stabilized during construction. <br /> <br />C. Field weld joists to supporting steel [hearing plates] [and] [framework]. Coordinate welding <br />sequence and procedure with placement of joists. Comply with A WS requirements and <br />procedures for welding, appearance and quality of welds, and methods used in correcting <br />welding work. <br /> <br />D. Bolt joists to supporting steel framework using carbon-steel bolts. <br /> <br />E. Bolt joists to supporting steel framework using high-strength structural bolts. Comply with <br />Research Council on Structural Connections' "Specification for Structural Joints Using <br />ASTM A 325 or ASTM A 490 Bolts" for high-strength structural bolt installation and <br />tightening requirements. <br /> <br />F. Install and connect bridging concurrently with joist erection, before construction loads are <br />applied. Anchor ends Df bridging lines at top and bottom chords if terminating at walls or <br />beams. <br /> <br />3.2 FIELD QUALITY COl'iTROL <br /> <br />A. Testing Agency: [Owll4~r will engage] [Engage] a qualified independent testing and inspecting <br />agency to inspect [field welds] [and] [bolted connections] and to perform field tests and <br />inspections and prepare test and inspection reports. <br /> <br />END OF SECTION 05210END OF SECTION 05210 <br /> <br />STEEL JOISTS <br /> <br />05210 - 4 <br />