My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2003 AlA <br /> <br />MASTERSPEC Short Form <br /> <br />08/03 (R 05/06) <br /> <br />3.7 <br />A. <br />B. <br />C. <br />D. <br />E. <br /> <br />F. Align webs of bottom chords and load-bearing studs or continuously reinforce track to transfer <br />loads to structure. Anchor trusses securely at all bearing points. <br /> <br />G. Install continuous bridging and permanently brace trusses as indicated[ on Shop Drawings and <br />designed according to LGSEA's Technical Note 551e, "Design Guide for Permanent <br />Bracing of Cold-Formed Steel Trusses. "] [.] <br /> <br />FIELD QUALITY CONTROL <br /> <br />Testing: Owner will engage a qualified independent testing and inspecting agency to perform <br />field tests and inspections and prepare test reports. <br /> <br />Field and shop welds will be subject to testing and inspecting. <br /> <br />Testing agency will report test results promptly and in writing to Contractor and Architect. <br /> <br />Remove and replace work where test results indicate that it does not comply with specified <br />requirements. <br /> <br />Additional testing and inspecting, at Contractor's expense, will be performed to determine <br />compliance of replaced or additional work with specified requirements. <br /> <br />3.8 REPAIRS AND PROTECTION <br /> <br />A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on fabricated and <br />installed cold-formed metal framing with galvanized repair paint according to ASTM A 780 and <br />manufacturer's written instructions. <br /> <br />B. Provide ftnal protection and maintain conditions, in a manner acceptable to manufacturer and <br />Installer, that ensure that cold-formed metal framing is without damage or deterioration at time <br />of Substantial Completion. <br /> <br />END OF SECTION 05400 <br /> <br />COLD-FORMED METAL FRAMING <br /> <br />05400 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.