My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AlA <br /> <br />MASTERSPEC Short Form <br /> <br />02/02 (R 05/06) <br /> <br />c. Infillload and other loads need not be assumed to act concurrently. <br /> <br />C. Seismic Performance: Provide metal stairs capable of withstanding the effects of earthquake <br />motions determined according to [ASCE 7, "Minimum Design Loads for Buildings and <br />Other Structures": Section 9, "Earthquake Loads."] <Insert applicable code <br />requirement.> <br /> <br />l.3 SUBMITTALS <br /> <br />A. Product Data: For metal stairs. <br /> <br />B. LEED Submittal: <br /> <br />1. Product Data for Credit MR 4.1 [and Credit MR 4.2]: For products having recycled <br />content, documentation indicating percentages by weight of postconsumer and <br />preconsumer recycled content. <br /> <br />a. Include statement indicating costs for each product having recycled content. <br /> <br />C. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work. <br /> <br />l. Include structural analysis data signed and sealed by the qualified professional engineer <br />responsible for their preparation. <br /> <br />1.4 COORDINATION <br /> <br />A. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, <br />concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in <br />concrete or masonry. Deliver such items to Project site in time for installation. <br /> <br />B. Coordinate locations of hanger rods and struts with other work so that they will not encroach on <br />required stair width and will be within the frre-resistance-rated stair enclosure. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 MANUFACTURERS <br /> <br />A. In other Part 2 articles where titles below introduce lists, the following requirements apply to <br />product selection: <br /> <br />1. Available Manufacturers: Subject to compliance with requirements, manufacturers <br />offering products that may be incorporated into the Work include, but are not limited to, <br />manufacturers specified. <br />2. Manufacturers: Subject to compliance with requirements, provide products by one of the <br />manufacturers specified. <br /> <br />METAL STAIRS <br /> <br />05511 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.