My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Specifications
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 4:33:06 PM
Creation date
4/12/2011 4:32:38 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />battens shall be retained in place by two 3/4 inch high carbon steel <br />bands. Four wood braces, placed at a 60 degree angle equidistant <br />around the plant, shall be nailed to the battens. No nails shall be placed <br />into the palm trunk. Four bracing pads shall be placed below grade at <br />the bottom of each brace. <br /> <br />9. Coconut Palm and Date Palm planting pits are to be backfilled with clean, <br />sharp, coarse, salt-free sand. <br /> <br />10. The Contractor is prohibited from storing on-site any plant material, <br />materials, or equipment if a storm approaching or exceeding hurricane <br />force winds is immanent. <br /> <br />11. The Contractor is responsible for re-setting and re-bracing of trees and <br />palms blown over or leaning from hurricane force or greater winds. This <br />Work will occur immediately (within one week from date of hurricane). <br />Payment for this Work will be additional and will be negotiated by the <br />City of Sunny Isles Beach. Any re-setting and re-bracing of palms <br />caused by winds less than hurricane force, and until final acceptance, is <br />the responsibility of Contractor, at no additional cost to City. <br /> <br />3.06 CONSTRUCTION REVIEW <br /> <br />A. In addition to other progress construction reviews, the Contractor shall schedule and <br />facilitate the following sub-trade related reviews, giving the Consultant at least 48 hours <br />before notice. <br /> <br />1. Review of proposed tree pit locations, as represented by staking. <br /> <br />2. Review, upon delivery, of plant materials at the site to verify species, vigor, size, <br />condition, shape, quantity, in compliance with specifications and drawings. <br /> <br />3. Review of tree pit excavation and fine subgrade. <br /> <br />4. Review of all backfilling for palm and tree pits as well as the placement of the <br />soil blanket. <br /> <br />5. Review of Work and materials after completion of planting. This review shall be <br />scheduled sufficiently in advance and in cooperation with the Consultant so that <br />it may be conducted within 48 (forty-eight) hours after completion of planting. <br /> <br />6. Review after a 30-day (thirty) period of maintenance, upon written request by <br />the Contractor. Request shall be received at least five days before anticipated <br />date of review. <br /> <br />7. Review for final acceptance. <br /> <br />3.07 MAINTENANCE <br /> <br />A. General: The Contractor shall maintain all planting, starting at the time of planting and <br />continuing until all planting is complete and accepted by the Consultant. <br /> <br />B. Work Included: <br /> <br />PAGE 12S OF 130 <br />BID No. 08-10-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.