Laserfiche WebLink
<br />A. Clean Up: Contractor to provide clean up and removal of debris as required after <br />operations for tree relocation. <br /> <br />B. Temporary Watering: Thoroughly soak root zone of relocated material until tree <br />relocation is complete and accepted by Consultant. It will be the Contractor's <br />responsibility to water all relocated plant material, in sufficient quantity to promote <br />vigorous growth, until the irrigation system is fully operational. <br /> <br />END OF SECTION <br /> <br />PAGE 129 OF 130 <br />BID No. 08-10-01 <br />