Laserfiche WebLink
<br />Evidence of Capabilities Continued <br /> <br />BIM Model and Preliminary Logistics <br />For every hour we spend in pre planning construction operations, it saves us at least four of field time. The im- <br />portance can't be underestimated. As part of the preconstruction process, we study the projects inside and out. <br />As demonstrated below we have already prepared an initial 3D study of the entire project utilizing BIM (Building <br />Information Modeling) software. This assists the team in understanding all of the major components in 3D drawings <br />even prior to commencing construction. It also reduces conflicts and change orders in the field. We can dissect the <br />building at any point of interest any time during the preconstruction and construction process. <br /> <br />We have also utilized the response period to begin our study of the site logistics and a preliminary construction <br />schedule. As the saying goes, a picture is worth a thousand words. We hope to have an opportunity to discuss and <br />expand on our plan of action and how we would move in and around the existing conditions to minimize the impact <br />to the city. <br /> <br /> <br />e Lagoon Dr. Suite 200 Miami, FI33126 <br />Phone: 305-559~900 <br />WNW.Coastaloonstruction.com <br /> <br /> <br />3D SECTION - SW CORNER OF GARAGE <br /> <br />E Coastal <br /> <br />Heritage Park & Parking Garage <br /> <br />0000 <br />4'112009 6:51:51 AM <br />Au1ho, <br /> <br /> <br />3D PROJECT MODEL <br /> <br />RFQ No. 09-03-01 Heritage Park and Parking Garage <br /> <br />13 <br />