My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Construction #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
Responses
>
Coastal Construction #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2011 2:07:33 PM
Creation date
4/22/2011 2:07:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />Memorial Hospital West <br />Pembroke Pines <br /> <br /> <br />IE Coastal <br /> <br />ED FALLIN, PROJECT EXECUTIVE Construction Experience: 34 yrs <br /> <br />Sunny Isles Beach and Parking Garage Experience: <br />Oceania Tower 5, Sunny Isles, FL Pour In Place-Parking Garage <br />Trump Royale, Sunny Isles Beach, FL 2 story/75, 000 SF-Pour In Place-PG <br />Bellamare, Williams Island, FL 2 story Pour In Place PG with 639 spaces <br />American Airlines Arena, Miami, FL <br />Portofino Condominium, Miami Beach, FL Subterranean 6 story Cast In Place <br />Parking Garage <br />Venice, Deering Bay, Coral Gables, FL <br /> <br />Education: <br />University of Florida, 1974 - 1975 <br />Associate of Science, Miami-Dade Community College, 1969 <br /> <br />Profile: <br />As the Project Executive, Mr. Fallin has the overall Executive level responsibility for <br />the project. In that role, he supports and reviews the operations of Coastal's on-site <br />staff. Ed interacts with the Owner regarding high level decisions and is always avail- <br />able to address any and all Owner concerns. During the preconstruction phase, Mr. <br />Fallin m'eets with the Owner and Architect to assure that the early phases of the project <br />including the planning are conducted meticulously. Ed's open door of policy allows <br />communications between Owners, Architects Engineers and employees. Mr. Fallin is <br />currently managing the Trump Royale. <br /> <br />GEORGE MORALES, SENIOR ESTIMATOR Construction Experience: 21 yrs <br /> <br />Sunny Isles Beach and Parking Garage Experience: <br />Jade Ocean, Sunny Isles Beach, FL 10 story Pour In Place-PG with 390 spaces <br />Memorial Hospital West Parking Garage, Pembroke Pines, FL <br />5 story Free Standing Precast Parking Garage with 1,500 spaces <br />One Riverview Square, Miami, FL 3 story Pour In Place-PG with 325 spaces <br />Metropolitan, West Palm Beach, FL 4 story Pour In Place-PG with 350 spaces <br />Hampton South, Aventura, FL 4 story Pour In Place-Parking Garage <br />The Lucerne, Lake Worth, FL 3 story Pour In Place-Parking Garage <br /> <br />Education: <br />Construction Management Degree, 1992 Technical University of Bolivar, Cartagena <br />AAS Mechanical Design Engineering, 1979 Queensboro College, New York <br /> <br />Profile: <br />With over 20 years of experience, George recognizes that the essential goal of provid- <br />ing value to the preconstruction process is accurate and effective estimating. He knows <br />that in order to accomplish this, it is paramount to develop strong relationships with <br />owners, design consultants, and the subcontractor market. George is involved in pre- <br />paring budgets from the schematic to the GMP phase. He takes the lead in reviewing <br />the Construction Documents and Project Specifications to insure complete coverage <br />during the pricing phase, George develops a strong relationships with the subcontrac- <br />tor market. George also takes the lead in the analysis of subcontractor and vendor pro- <br />posals to insure that costs are reflective of actual market conditions. He will be involved <br />in analyzing and evaluating alternate materials and methods of construction in order to <br />offer the best value to our clients. <br /> <br />RFQ No. 09-03-01 Heritage Park and Parking Garage <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.