My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
N&J
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
Responses
>
N&J
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2011 4:57:36 PM
Creation date
4/25/2011 4:57:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />t <br /> <br />r~." <br />~WL <br />~ <br /> <br />Prinl#71121037 <br />Date:11/21/07 <br /> <br />~ ""ill PholoQI1IPhY. InC. 954-568-0484 <br /> <br />N~ CONSTRUCTION <br /> <br />Weston City Hall <br /> <br />Weston City Hall <br />17200 Royal Palm Boulevard <br />Weston, FI 33331 <br /> <br />Owner Information: <br />City of Weston City Manager John Flint <br />954-385-2000 <br />Calvin Giordano & Associates <br />Sabrina Baglieri, Project Manager <br />Phone: 954-921-7781 <br /> <br />1800 Eller Drive, Suite 600 <br />Fort Lauderdale, Florida 33316 <br /> <br />N & J Construction served as the General Contractor for the state of the art, new <br />Weston City Hall. The project site consisted of 3% acres located at 17200 Royal Palm <br />Boulevard. This one-story, 14,000 square foot building includes offices, meeting rooms <br />and a Commission Chamber with auditorium seating for 156 people. The exterior of the <br />building is predominantly stone while the interior finish is a mix of stone and wood. The <br />project also includes a fully integrated generator system, parking, landscape, entry <br />spaces, drainage, and paving. Lobby boasts 22 feet high ceilings with wood covered <br />columns, fiber optically lit, glass entry feature at the commissions' chambers. <br />Jerusalem Stone veneer with granite accent bands with great attention to workmanship <br />make the building exterior visually pleasing. Our outstanding workmanship is evident <br />throughout in the mix of high end finishes that include wood floors, glass and marble. <br />The Commission Chamber walls are acoustically treated with wood sound absorption <br />panels. The City Hall was also built to serve as an EOC center in case of emergency. <br />Project value $6,500,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.