Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />II <br /> <br />n <br />I.i <br /> <br />I~ <br /> <br />.11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 . <br /> <br />SOARES DA COSTA <br /> <br />STATEMENT OF QUALIFICATIONS <br /> <br />- --..........- - -- <br /> <br />. Associated Consulting Tech - Soares da Costa employs the services of an independent <br />consultant, Associated Consulting Technicians (ACT) to prepare and update project <br />schedules on a continuing basis. The president of ACT, Doug Peterson has provided <br />consulting services including scheduling services on more than (500) complex projects. <br />Included in these projects is in excess of (300) Public Facilities with more than (150) <br />Educational Facilities. <br />Similar Projects: <br />ACT has provided construction schedules for the following projects completed by Soares Da <br />Costa. City 24, The Blue Condominium, Marina Blue Condominium, Continuum II, Parc <br />Place, Lamar Louise Curry Middle School, Everglades High School, Felix Varela Senior <br />High School, Hialeah Senior High School, Dr. Michael Krop Senior High School, Hubert <br />Sibley Elementary School, Highland Oaks Middle School West, Miami Lakes Technical <br /> <br />We have listed above two separate precast manufacturers; this was done for several reasons. In. <br />the past due to job locations we have sometimes used both precasters on the same project with <br />one providing the structure and one providing architectural precast spandrels and wall panels. <br />Depending on the method of contracting, we may also elect to get proposals from both to allow <br />Soares Da Costa to provide the optimum design for converting to a precast structure in lieu of the <br />poured in place post tension design. <br /> <br />We have provided contract documents to both companies for review and they both find the existing <br />design will allow for the conversion with out changing overall design esthetes. <br /> <br />We feel this approach of bringing together this type of team will assure a cohesive effort by all <br />parties to make this a successful project for the City of Sunny Isles as well as for our team. <br /> <br />. REQUEST FOR QUALIFICATIONS NO. 09-03-01 <br />PROFESSIONAL CONSTRUCTION SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE <br />CITY OF SUNNY ISLES BEACH, FLORIDA <br />