Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />~ <br />C <br />C <br /> <br />n <br />1.1 <br /> <br />..111111111111111111.. <br /> <br />SOARES DA COSTA <br /> <br />Project Name <br /> <br />City 24 <br /> <br />Continuum II <br /> <br />Project Description <br /> <br />Condominium located at <br />the heart of Miami Beach, <br />consisting of 119 living <br />units, together with retail <br />space, recreational and <br />other commonly used <br />facilities, including but not <br />limited to, pool, spas, pool <br />deck, bathrooms and a <br />parkinq space. <br />I n the best location 0 <br />Miami Beach, this firs <br />class high rise building, <br />consists of 37 stories, <br />containing 193 dwellings <br />units and 7 townhouses <br />and 7 Lofts, together with <br />commercial retail areas, <br />recreational and other <br />commonly used facilities to <br />include but not necessarily <br />limited to spas, recreation <br />area, bathrooms, lobby and <br />parking garage. <br /> <br />STATEMENT OF QUALIFICATIONS <br /> <br />C I t" Project Owner Name- <br />omp e Ion N <br />Project Cost D t St t Address-Phone- ame <br />a e or a us of Contact Person <br /> <br />$27,800,000 February/2008 <br /> <br />Panterra Development <br />Rick Muscenic <br />4770 Biscayne Blvd. <br />Suite 570 <br />Miami, FL 33126 <br />(305) 576-6766 <br /> <br />$98,740,000 March/2008 <br /> <br />South Beach Ocean <br />Parcel II <br />Heinrich Von Hanau <br />200 South Pointe Drive, <br />Miami Beach, FL 33139 <br />(305) 534-8483 <br /> <br />8. Evidence of capabilities for construction scheduling, material procurement, and <br />assurance that plans, specifications, and schedules are met. <br /> <br />The Blue Condominium and the Continuum II projects are an example of two of our projects that <br />exemplify our capabilities of construction scheduling, material procurement and assurance that <br />plans, specification and schedules were met. <br /> <br />These projects were completed on schedule or ahead of schedule with all approvals signed by <br />all of the city local governing agencies and to the satisfaction of the ArchitecUEngineer Design <br />team as well as the Owner Developers. See attached letter of recommendation. It should also <br />be noted that our team member "ACT" specializes in scheduling arid construction management <br />and will be updating all schedules for this project on a monthly basis. <br /> <br />Project Initial Proposed Schedule Actual Final Schedule <br />Highland Oaks Middle School 10/12/2006 10/12/2006 <br />West Center <br />The Blue Condominium 01/29/2006 08/2005 <br />Marina Blue Condominiums 03/15/2008 03/15/2008 <br />City 24 03/07/2007 02/28/2008 <br />Continuum II 03/14/2008 03/14/2008 <br /> <br />REQUEST FOR QUALIFICATIONS NO. 09-03-01 <br />PROFESSIONAL CONSTRUCTION SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE <br />CITY OF SUNNY ISLES BEACH, FLORIDA <br />