Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />C <br />'e <br />~ <br /> <br />.111111111111111111111 <br /> <br />SOARES DA COSTA <br /> <br />STATEMENT OF QUALIFICATIONS <br /> <br />6. Description of how contractor's team will be organized and assigned responsibility <br />for the project. . <br /> <br />This project as presently designed is based on a poured in place post tension system. Soares Da <br />Costa has extensive experience with this design as evidenced by the Construction of the following <br />High-Rise and Mid-Rise construction projects completed in the last five years in Miami, Florida. <br /> <br />. The Blue Condominiums a 36 story residential building with six (6) floors of parking garage <br />. Marian Blue Condominiums a 58 story residential building with seventeen (17) floors of <br />parking garage <br />. Continuum Condominiums a 30 story residential building with two (2) floors of parking <br />garage <br />. City 24 Condominiums a 15 story residential building with four (4) floors of parking garage <br /> <br />However, after consideration of the schedule and cost, it is our recommendation that this project <br />can best be achieved by going to a precast structure. This will allow the structure to be <br />manufactured while the site and foundation work are being completed in the field. It also provides a <br />better finished product and offers a multitude of finishes to the exterior fac;:ade not available with a <br />poured in place structure. <br /> <br />It should also be noted that the precast structure is virtually maintenance free. It would also be our <br />recommendation to go with pre topped DBL Tee's to again provide a factory finish which will be <br />superior to a poured in place finish. This will also expedite the schedule by reducing by another <br />step that will not have to be performed on site. <br /> <br />Our Senior Project Manager Mr. George Egalite who will be the lead Project Manager for this <br />project has an extensive background in the construction and precast industry extending back to the <br />1970's. This includes Design, Manufacture and Erection of Architectural and Structural precast <br />projects throughout the state of Florida and Georgia. He has over twenty (20) years experience in <br />design and manufacturing of precast and six years of overseeing erection of architectural and <br />structural precast projects. During these years he has worked with the major precasters; Gate <br />Concrete, Core Slab Structures, Durastress and Florida Precast. Mr. Egalite has been with Soares <br />Da Costa for the past five (5) years as Senior Project Manager for several major projects here in <br />South Florida. <br /> <br />Our team for this project will be comprised of members of our company who have the experience of <br />working together, but more importantly a team of manufacturers of precast and subcontractors who <br />have worked together on numerous projects throughout Florida for the past twenty (20) years. This <br />is not just the companies, but more specifically the collection of individuals with these companies <br />who have a history of working together. <br /> <br />The project team outside of SDC will be made up of the following: <br /> <br />. Gate Precast Company - Gate Precast Company is the largest producer of architectural <br />precast concrete in the United States with six architectural precast manufacturing facilities <br />and two structurallprestressed manufacturing facilities that operate under the name of Gate <br />Concrete Products Company. <br />Website: www.Qateprecast.com <br />Mr. Dean Gwin - President and C.O.O <br />Mr. Earl Shimp - Sr. Vice President of Operations <br /> <br />REQUEST FOR QUALIFICATIONS NO. 09-03-01 <br />PROFESSIONAL CONSTRUCTION SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE <br />CITY OF SUNNY ISLES BEACH, FLORIDA <br />