My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
West Construction, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Reponses
>
West Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:33:47 AM
Creation date
5/12/2011 11:33:38 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure 175 & Collins
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 00300 <br /> <br />BID FORM <br /> <br />Bid of <br /> <br />West Construction, Inc. <br /> <br />Address <br /> <br />318 South Dixie Highway, Suite 4-5, Lake Worth, FL 33460 <br /> <br />Phone <br /> <br />561-588-2027 <br /> <br />To furnish all materials, equipment and labor and to perform all work in accordance with <br />the Contract Documents for construction of: Median Closure at NE 175th Terrace on <br />Collins Ave. and SR A 1A/Collins Ave. at 1831d St. Streetscape Improvements <br />located in the CITY OF SUNNY ISLES BEACH. <br /> <br />To: CITY OF SUNNY ISLES BEACH <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />The undersigned Bidder has carefully examined the Bidding Documents and the site of the <br />proposed work and is familiar with the nature and extent of the work and any local <br />conditions that may in any manner affect the work to be done. <br /> <br />The undersigned Bidder agrees to do all the work and furnish all materials called for by the <br />Bidding Documents, in the manner prescribed therein and to the standards of quality and <br />performance established by the Engineer for the unit price amounts stated in the spaces <br />herein provided, for each of the items or combination of items stipulated. Unit price line <br />items shall include cost of implementing all applicable safety requirements. Bidder <br />acknowledges that estimated quantities scheduled are approximated for the sole purpose <br />of obtaining comparative bids for determination of the lowest responsible responsive bidder <br />and actual quantities required may increase or decrease. Bidder further agrees that <br />payments will be made on the basis of actual quantities placed and accepted in the <br />construction <br /> <br />09/09 <br /> <br />00300-1 <br /> <br />03-4122.F <br />
The URL can be used to link to this page
Your browser does not support the video tag.