My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 09-11-01 Prof. Design & build svcs. for skateboard park
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 3:53:42 PM
Creation date
5/13/2011 3:52:43 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & build svcs for skateboard park
Bid No. (xx-xx-xx)
09-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'l <br />~) <br />~ <br />') <br />. <br />') <br />~) <br />'1 <br />') <br />.It <br />e) <br />~ <br />() <br />~ <br />~ <br />:l <br />~ <br />... <br />~ <br /> <br /> <br />Proposed Personnel Assignments <br /> <br />Pios and Sons Enterprises, Inc. employs 14 full time employees. The following is a breakdown of how staff would be <br />assigned to the City of Sunny Isles Beach during the design and execution of project. <br /> <br />General Project Manager: Hector M. Ortiz, resume attached <br />. Schedule and coordinate timely meetings with design team and the City. <br />. Develop a master schedule and define all pertinent tasks. <br />. Coordination with the city during design and build phases <br />. Managing design team, construction team, scheduling, and execute contract. <br />. Primary contract administrator. <br /> <br />- <br />.. <br />-. <br />...... <br />....... <br />. <br /> <br />. <br />. <br />"> <br />., <br />, <br />:t <br />:t <br />,. <br />') <br />*1 <br />.It <br />..~ <br />.... <br />~ <br />:t <br />) <br />") <br />..... <br />. <br />) <br />oft <br />" <br /> <br />Programming and Conceptual Design: Michael R. McIntyre, from SITE Design Group, Inc., resume attached <br />· Certified Landscape Tech, Irrigation (CLT#966 1 7), Construction (CLT#96595). <br />. Prepare conceptual and schematic designs providing details and direction as to the materials, location and <br />dimensioning of the design elements. <br />· Primary goals to include Green Design by: <br />· Promoting Alternative Transportation: Bike Racks, Trails, Skate Paths, etc. <br />· Include Native Plants in Landscaping. <br />· Limit The Impacts Associated Replacing Green Space With Concrete. <br />· Limit the Removal Of Trees. Reduce Heat Island Effect <br /> <br />Construction Project Manager: Richard Yong, resume attached <br />· Execution of site development and construction scope of work. <br /> <br />· Execution of scheduled program and overall items of final schematic skate park design. <br /> <br />· Layout <br /> <br />· Grading <br /> <br />· Drainage <br /> <br />· Construction Details <br /> <br />2 crews consisting of 1 foreman, 2 operators and I laborer. <br />· Site development and construction. <br /> <br />2 Office Staff: <br />· General office duties required for the execution of contract. <br />· Certified payrolls. <br />· Weekly construction reports. <br />
The URL can be used to link to this page
Your browser does not support the video tag.