My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GC Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(11-04-03) Stormwater Catch Basin Cleaning
>
Responses
>
GC Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2015 9:51:13 AM
Creation date
5/26/2011 10:49:56 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Storm Water Catch Basin Cleaning
Bid No. (xx-xx-xx)
11-04-03
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti <br />v�k <br />4 <br />\9 <br />1� <br />r# <br />tiF �k FLO�� `4 <br />C,T r OF suo P0O <br />Addendum No. 4 <br />CITY OF SUNNY ISLES BEACH <br />Stormwater Catch Basin Cleaning <br />CITY RFQ NO. 11 -04 -03 <br />To All Bidders: <br />Bidders for the above - referenced project shall take note of the following changes, <br />additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br />Request for Information: <br />• Please clarify the amount of catch basins and man holes that need to be <br />cleaned out. The bid line item is only for catch basins, are you going to add a <br />line item for manholes? Manholes and catch basins are two different items <br />and may take different methods of cleaning. <br />The bid is only for catch basins. Per section 4.0 of the bid document there will <br />be a total of 548 catch basins to be cleaned. This number includes the needs <br />of all three (3) participating cities per section 2.19 of the bid document. <br />• Bid Form has 598 basins and 37,400 LF of jetting, yet elsewhere you have <br />26,200 LF of pipeline and 464 structures. Can you please provide information <br />with regard to actual quantities and pipe sizes of Storm Water Drainage Pipe <br />and Drainage structures? <br />1"he response to #2 lies within the body of the atlas (attached). The numbers <br />are correct as stated subsequently. The lower quantities are the ones we will <br />use to determine the unit price. <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.