My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-0906 Special City Commission Meeting
SIBFL
>
City Clerk
>
City Commission Minutes
>
2011
>
2011-0906 Special City Commission Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 1:47:44 PM
Creation date
10/25/2011 10:10:26 AM
Metadata
Fields
Template:
CityClerk-City Commission
Meeting Type
1st Budget Hearing
Date (mm/dd/yyyy)
09/06/2011
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Summary Minutes: Special City Commission Meeting September 6,2011 <br />First Budget Hearing <br /> <br />Sunny Isles Beach, Florida <br /> <br />accurate timeline by then as well. He said it is also part improvements on the restaurant. <br /> <br />Mayor Edelcup said in going through some of these, Collins Avenue Sidewalk <br />Improvements on page C-13, in the description area you have four different phases, can you <br />put timelines on each of those phases because he wants to start holding people accountable for <br />when they are going to deliver something. On Atlantic Isle, this relates to putting in the <br />streetscape, it looks like there is four different areas of Collins Avenue on the west side, and if <br />you could just break out separate times, estimates when each of those are going to be <br />complete. Another area he would like to talk about is Pedestrian and Emergency Vehicular <br />Bridge on page C-15, is $4.7 Million a good number or is it a conservative number, for the <br />same reasons he spoke of about the Pier he mentions this one that we don't want to have an <br />open invitation to spend up to $4.7 Million. City Manager Cohen said this is probably a very <br />conservative number right now, it has not been subjected to the level of scrutiny that it will be. <br /> <br />Mayor Edelcup said on page C-18 Heritage Park and Parking Garage Improvements, as a <br />comment it shows a completion date of August 2012, is that true, and City Manager Cohen <br />said no, and then he asked how long before we expect the shade structured canopies to go up, <br />and Public Works Director Gio Batista said the schedule produced by the contractor for the <br />stage canopy had a date of about when the Jazz Fest was going to take place, and so we are <br />currently looking at mid-November for that canopy to be up on the stage. Assuming we go to <br />RFP in October for the play structure we can assume it will be three months. Mayor Edelcup <br />said that the report says we are not going to do anything in Heritage Park until March 2012 <br />and we won't have anything finished until August which is conflicting, and he asked to <br />change the dates to reality. Vice Mayor Thaler said this is the first time he is hearing that it is <br />beyond 120 days, and Public Works Director Batista said for the canopy on the stage, we <br />received a construction schedule from the vendor in accordance with the contract. When we <br />reviewed it we noticed that it was going to be a very tight fit, we did not want to implicate the <br />Jazz Fest with construction material laying around, sod being in disrepair, and leaving it to the <br />contractor's ability to make adjustments, and so we decided at stafflevel to take the control in <br />our hands and say, if there is no assurance that we are going to have the canopy up by Jazz <br />Fest we would rather pull it back a little to make sure that they are able to get that structure in. <br /> <br />Mayor Edelcup said that the Commission set a date, why didn't you come back to the <br />Commission, and City Manager Cohen said we were presented with an initial design by the <br />contractor, we were not happy with it because we felt there were some deficiencies in it, we <br />went back and forth with the contractor until we were able to resolve those design deficiencies <br />which were just resolved last week. Vice Mayor Thaler said you are now talking about a year, <br />from three months to a year, and Mayor Edelcup said the canopy for the stage was supposed to <br />have been before the Jazz Fest this year, and as it relates to the playground equipment, that <br />will be in before next August. Public Works Director Batista said the Stage Canopy will be in <br />by mid-November, and that we have to do what we mentioned with the streetscape, we have <br />to split these up to make sure the dates are understood for each particular event. <br /> <br />Mayor Edelcup asked if these are the same people that put in the canopy at PCP, and Mr. <br />Batista said they are the same people who are fabricating the canopy, and Mayor Edelcup said <br />we had trouble with them, and yet you decided to use the same people. Mr. Batista said no, <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.