My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-0920 Special City Commission Meeting 2nd Budget
SIBFL
>
City Clerk
>
City Commission Minutes
>
2011
>
2011-0920 Special City Commission Meeting 2nd Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 1:47:58 PM
Creation date
10/25/2011 10:18:45 AM
Metadata
Fields
Template:
CityClerk-City Commission
Meeting Type
2nd Budget Hearing
Date (mm/dd/yyyy)
09/20/2011
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Summary Minutes: Special City Commission Meeting September 20,2011 <br />Second Budget Hearing <br /> <br />Sunny Isles Beach, Florida <br /> <br />not accommodate that many people. This is for the construction of a 10 x 10 shelter, we can <br />go with what we have now and put a few of them next to each other. Vice Mayor Thaler <br />thought there would be a bigger shelter, and Mayor Edelcup said we have two sizes in the <br />City. Assistant City Manager Vera said we have talked about it but there is no protection for <br />the kids at all, and City Manager Cohen said we can go back and look at larger pre-fab <br />shelters. Vice Mayor Thaler said why don't you come back and let us see the bigger one and <br />what kind of protection it has, and Mayor Edelcup said to see if you can buy a standard bus <br />shelter that is big enough. Mayor Edelcup asked what the fence protection is, and City <br />Manager Cohen said the fence protection is for the top floor of the garage given the activity <br />we have had up there. <br /> <br />Vice Mayor Thaler asked if all the canopies can be done by one person, and Mr. Batista said <br />yes. Vice Mayor Thaler said we did have the problem with the canopy, are we going to stay <br />away from the one that did the work at Pelican Community Park and at the Post Office. Mr. <br />Batista said we will have to go to legal for that one, he doesn't know if we can preclude <br />anyone from participating in the RFP, at the end of the day when we review the proposals we <br />will have to make that determination. City Attorney Ottinot said that we can have a factor in <br />terms of past relationships with the City in the RFP, and Mayor Edelcup said if it is the same <br />people you may want to confer with Susan Simpson because that was an ordeal to get done. <br /> <br />Commissioner Aelion asked about the projected Gateway Park development, it is to begin <br />in October 2013 and the FDOT program, will there be any conflict of performance there, and <br />Mr. Batista said the Collins A venue reconstruction, or that little piece that FDOT is going to <br />be working on has not been defined in their work program. We put it in FY 2013 thinking <br />that will be the time it is going to come but it will not be implicated any way or impact in <br />anyway for Gateway Park. City Manager Cohen said that the FDOT program is limited to <br />the crosswalks that the gentleman from FDOT presented two or three meetings ago, and that <br />is just around the bullnose of the piece of land at the eastern most part that we are talking <br />about. Our construction will be far removed from that, neither should impact the other. <br />Commissioner Aelion said everything will be blocked or closed, and City Manager Cohen <br />said fortunately we have access at two different points, Sunny Isles Boulevard or Collins <br />A venue for the project. <br /> <br />Mayor Edelcup said the three parks at the end of Intracoastal Parks, you don't have <br />construction beginning until a year from now for all three, and City Manager Cohen said <br />what this does not specifically reflect is that there will be some initial work done through our <br />maintenance contract with FSM or whoever we are working with at the time to put in the <br />initial irrigation system and to put grass down. The construction period is really to do the <br />major landscaping and the amenities, the wall, the sidewalk that runs through, those major <br />components so there will be some initial work done and we are hoping that it is done in a <br />more timely manner than the first parcel. Mayor Edelcup said in the first parcel we should be <br />able to do something immediately, and hopefully they will do it in phases so that we are not <br />looking at a raw construction site for a year. City Manager Cohen said we are going to make <br />it look acceptable and then we are going in at once to do the components that are tied <br />together between the different sites. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.