My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2011-1822
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2011
>
Reso 2011-1822
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2011 2:52:50 PM
Creation date
12/21/2011 2:52:12 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2011-1822
Date (mm/dd/yyyy)
12/15/2011
Description
Miami-Dade Co Water & Sewer Conveyance Docs: Sewer Imp. Margolis Pk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RESOLUTION NO. 2011- ~ <br /> <br />A RESOLUTION OF THE CITY COMMISSION OF THE <br />CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING <br />THE MIAMI-DADE COUNTY WATER AND SEWER <br />CONVEYANCE DOCUMENTS FOR THE SEWER <br />IMPROVEMENTS CONSTRUCTED AS P ART OF THE <br />CENTRAL ISLAND ROADWAY AND DRAINAGE <br />IMPROVEMENTS PROJECT; AUTHORIZING THE <br />MAYOR TO EXECUTE SAID CONVEYANCE <br />DOCUMENTS; AUTHORIZING THE CITY MANAGER TO <br />DO ALL THINGS NECESSARY TO EFFECTUATE THIS <br />RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. <br /> <br />WHEREAS, the City had continuously experienced problems with flooding in the <br />Central Island area, and was in need of engineering services for drainage improvements in the <br />Central Island area; and <br /> <br />WHEREAS, on December 18, 2003 the City Commission, via Resolution No. 2003-628, <br />approved an agreement with Beiswenger, Hoch & Associates for Stormwater System Design, <br />Technical Assistance and Bidding Process for Central Island Stormwater Drainage; and <br /> <br />WHEREAS, on February 21, 2008 the City Commission, via Resolution No. 2008-1221, <br />awarded Bid No. 07-10-02 to and entered into an agreement with Southeastern Engineering <br />Contractors, Inc. to provide services for the Central Island Drainage and Street Improvements <br />Project; and <br /> <br />WHEREAS, Southeastern Engineering Contractors constructed a sewer facility (i.e. <br />sewer lateral connection) in the pubic right-of-way along North Bay Road adjacent to the Senator <br />Gwen Margolis Park for the use of restrooms; and <br /> <br />WHEREAS, Miami-Dade County requires that such improvements be conveyed to the <br />County's Water and Sewer Department; and <br /> <br />WHEREAS, the County provided the City with conveyance documents consisting of <br />Absolute Bill of Sale, Waiver and Release of Lien, and Warranty forms for execution by the City; <br />and <br /> <br />WHEREAS, once the conveyance documents are executed and accepted by the County, <br />the Sewer thereafter shall be a public sewer under the sole jurisdiction of Miami-Dade County; <br />and <br /> <br />WHEREAS, the City now wishes to approve the Conveyance Documents. <br /> <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE <br />CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: <br /> <br />R2011- Miami Dade Co Water And Sewer Conveyance Docs. Page I of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.