My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zurqui
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-10-01 Design and Construction of Canopy at Heritage
>
Responses
>
Zurqui
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 11:24:30 AM
Creation date
1/11/2012 3:05:01 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Canopy at Heritage Park
Bid No. (xx-xx-xx)
11-10-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FE <br />W <br />ZURQUI <br />Construction Services, Inc <br />ANI,I1[1rei� <br />Senior Project Manager <br />Education: Florida International University <br />BA in Construction Management <br />PHONE & FAX PROJECT MANAGER I EMAIL <br />+305- 221 -6100 Eddy Gonzales Jr <br />+ 305- 221 -6110 Eddy @zurquis.com <br />Certifications: LEED Accredited Professional <br />Post- tensioning Institute <br />Level I field fundamentals for un- bonded post - tensioning <br />OSHA 30 hour Construction Safety & Health <br />Construction Years: 13 years experience in the construction industry <br />EXPERIENCE: <br />0 Lennar Homes SE, Miami FL, 2004 -2009 <br />• Managed the turnover of the facilities of the 360 & Colonnade Condominiums from the <br />developer to the Home Owner Associations <br />• Assisted in the due diligence stage for the purchase of a 527 unit 43 acre partially completed <br />condominium project in Doral, FL. Continued with the subcontractor buy out and <br />O management of construction activities of the project as a project manager /superintendent <br />Lennar Developers, Inc. Miami, FL, 2004 -2008 <br />• 360 condominiums — 100 million dollar, 2 phase project, 414 luxury units condominium and <br />marina <br />• Colonnade Condominiums — 100 million dollar, 4 phase project, 570 unit condominium <br />Turner Construction Company, Miami, FL, 2000 -2004 <br />• Mutiny Park — 53 million dollar 23 story hotel /condo. Superintendent /project engineer for <br />high end event rooms, commercial kitchen, and pool deck. Responsible for submittals and <br />shop drawings for area as well as MEP coordination and start -ups. <br />• La Perla — Project Engineer for the pre- construction on a 42 story condominium. Wrote <br />(J scopes for the demolition phase and the erection of the building. Handled all submittals, <br />change orders, and pay applications. <br />• Sonesta Hotel — 1 million dollar interior build out. Requested by owner. Project <br />Manager /Superintendent for entire project. <br />• Courtyard Marriott — 10 million dollar 5 story hotel. Superintendent for the exterior and MEP <br />coordinator for the interior. Handled all exterior submittals and shop drawings. <br />• Fire safety upgrades for Miami Dade Public Schools. Superintendent for retrolit of fire <br />alarm, fire sprinklers, and smoke evacuation. <br />• Circuit City — 3.3 million dollar interior renovation. A 3 phase renovation that occurred while <br />store was in operation Superintendent for all daytime work. <br />U <br />
The URL can be used to link to this page
Your browser does not support the video tag.