My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HA Contracting Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-11-03 Collins Avenue Streetscape
>
Responses
>
HA Contracting Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 3:51:39 AM
Creation date
1/11/2012 3:51:16 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Collins Ave. Streetscape
Bid No. (xx-xx-xx)
11-11-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED PROPOSAL FORM (PROPOSAL #)l <br />PROJECT: <br />PROPOSAL SUBMITTED TO: <br />PROPOSAL SUBMITTED BY: <br />Collins Avenue Streetscape (Westside) <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida <br />H. A. Contracting Corp. <br />FDOT" Index <br />Price per <br />Items <br />Number <br />UNIT <br />UOM <br />Approximate <br />sTotal <br />** <br />Quantitiees " <br />Westside Collins Avenue Sidewalk from 183 St —185 St <br />Concrete Sidewalk <br />Demolition /Hauling <br />FDOT Standard <br />LF of full width <br />$ 19 <br />544 I.f. <br />Specs <br />sidewalk <br />10,336 <br />New Sidewalk - <br />Concrete Pavers on <br />FDOT Standard <br />LF of full width <br />Sand and concrete as <br />Specs. <br />sidewalk <br />$ 87 <br />544 l.f. <br />47,328 <br />necessary — other items <br />Concrete Color Patch <br />Per <br />and Concrete <br />manufacturer <br />LS <br />$5,500 <br />5, 500 <br />restoration " <br />secs. <br />Mobilization <br />FDOT 101 <br />LS <br />$ 970 <br />970 <br />Maintenance of Traffic <br />FDOT 102 <br />- - <br />LS - <br />$ 540 <br />540 <br />Westside Collins Avenue Sidewalk from 185 St --186 St <br />Concrete Sidewalk <br />Demolition /Hauling <br />FDOT Standard <br />LF of full width <br />$ 19 <br />394 I.f. <br />Specs. <br />sidewalk <br />7,486 <br />New Sidewalk - <br />Concrete Pavers on <br />FDOT Standard <br />LF of full width <br />Sand and concrete as <br />Specs. <br />sidewalk <br />$87 <br />394 1.f. <br />34,278 <br />necessary — other items <br />Concrete Color Patch <br />Per <br />and Concrete <br />manufacturer <br />LS <br />$7,200 <br />7, 2 0 0 <br />restoration'" <br />secs. <br />Mobilization <br />101 <br />LS <br />$ 970 <br />970 <br />Maintenance of Traffic <br />102 <br />LS <br />$ 540 <br />540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.