Laserfiche WebLink
New Sidewalk - <br />FDOT Standard <br />Concrete Pavers on <br />Specs. <br />LF of full width <br />Sand and concrete as <br />sidewalk <br />$87 <br />604 I.f. <br />52,548 <br />necessary — other items <br />Concrete Color Patch <br />Per <br />and Concrete <br />manufacturer <br />LS <br />$8,100 <br />8, 100 <br />restoration *" <br />secs. <br />Mobilization <br />101 <br />LS <br />$970 <br />9 7 0 <br />Maintenance of Traffic <br />102 <br />LS <br />$ 540 <br />540 <br />Westside Collins Avenue Sidewalk from Poinciana — SR 826'x*** (see notes) <br />Concrete Sidewalk <br />FDOT Standard <br />LF of full width <br />Demolition /Hauling <br />Specs. <br />sidewalk <br />$19 <br />562 Lf. <br />10,678 <br />New Sidewalk - <br />FDOT Standard <br />Concrete Pavers on <br />Specs. <br />LF of full width <br />$87 <br />562 I.f. <br />48,894 <br />Sand and concrete as <br />sidewalk <br />necessary — other items <br />Concrete Color Patch <br />Per <br />and Concrete <br />manufacturer <br />LS <br />$14,000 <br />14,000 <br />restoration" <br />secs. <br />Mobilization <br />101 <br />LS <br />$970 <br />970 <br />Maintenance of Traffic <br />102 <br />LS <br />$540 <br />54 0 <br />Westside Collins Avenue Sidewalk from 172" —174 <br />Concrete Sidewalk <br />FDOT Standard <br />Demolition /Hauling <br />Specs. <br />LF of full width <br />sidewalk <br />$ 19 <br />806 l.f. <br />15,314 <br />New Sidewalk - <br />FDOT Standard <br />Concrete Pavers on <br />Specs. <br />LF of full width <br />$87 <br />806 U. <br />70,122 <br />Sand and concrete as <br />sidewalk <br />necessary — other items <br />Concrete Sidewalk <br />FDOT-Standard <br />- <br />Demolition /Hauling <br />Specs. <br />SF <br />$ 3 <br />350 Sq.Ft, <br />1,050 <br />Park Entrance <br />New Sidewalk - <br />FDOT Standard <br />Concrete Pavers on <br />Specs. <br />Sand and concrete as <br />necessary — other items <br />SF <br />$ 12.50 <br />350 Sq.Ft. <br />4,375 <br />Park Entrance — Pattern <br />to be Determined <br />Concrete Color Patch <br />Per <br />and Concrete <br />manufacturer <br />LS <br />$8,900 <br />8, 9 0 0 <br />restoration" <br />secs. <br />Mobilization <br />101 <br />LS <br />$ 970 <br />970 <br />Maintenance of Traffic <br />102 <br />LS <br />$540 <br />54 0 <br />