My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-1834
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-1834
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2012 4:20:03 PM
Creation date
2/1/2012 10:02:30 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-1834
Date (mm/dd/yyyy)
01/19/2012
Description
RFP 11-11-03/Agmt w/Tenex: Collins Ave (West Side) Sidewalk Pavers
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Project Manager means an employee or representative of the City assigned to manage <br />and monitor the Work to be performed under this Agreement and the construction of the <br />Project. <br />Project means the construction and incidentals thereto, of the project entitled RFP I 1- <br />11-03 for the Work described in the Contract Documents. <br />Punch List means a compilation of items of Constmction Work required to be performed by, <br />or through the Contractor after the Substantial Completion inspection and prior to Final <br />Completion and payment. <br />Request For Information (RFI) means a request from the Contractor seeking an <br />interpretation or clarification by the City relative to the Agreement and/or the Contract <br />Documents. The RFI, which shall be clearly marked RFI, shall clearly and concisely set <br />forth the issue(s) or item(s) requiring clarification or interpretation and why the response <br />is needed. The RFI must set forth the Contractor's interpretation or understanding of the <br />document(s) in question, along with the reason for such understanding. <br /> <br />Schedule of Values means a written schedule setting forth the detailed and itemized cost <br />breakdown, inclusive oflabor, material, and taxes of all elements comprising the Work. <br /> <br />Specifications and Plans as used herein means that portion of the Contract <br />Documents which are the written requirements for the materials, equipment, systems, <br />standards and workmanship for completion of the Work and performance of related <br />services. <br /> <br />Sub-Contractor(s) means a person or entity other than a materialman or laborer that <br />has a direct contract with the Contractor to perform or supply any portion of the Work. <br /> <br />Substantial Completion means that point at which the Work is at a level of completion <br />in substantial compliance with the deadlines set forth in the City's Notice(s) to Proceed <br />such that the City can use, occupy and/or operate the facility in all respects to its <br />intended purpose. Substantial Completion shall be evidenced by the City's execution of <br />a Certificate of Substantial Completion. <br />Time for Completion means the date of Substantial Completion as specified in the <br />City's Notice(s) to Proceed. <br /> <br />Work as used herein refers to all services required by the Contract Documents, <br />including all labor, materials, equipment, supervision and services needed to complete <br />the Project and Contingency Services in accordance with the Contract Documents. <br /> <br />ARTICLE I. SCOPE OF WORK <br /> <br />Contractor shall provide all labor, materials, equipment, tools, manpower, <br />management, supervision, and all other necessary goods and services to perform the <br />Work in the manner provided this Agreement and the Contract Documents. <br /> <br />ARTICLE 2. CONTRACT TIME, TIME FOR COMPLETION AND <br />LIQUIDATED DAMAGES <br /> <br />2.1 Time is of the essence in the performance of the Work under this Agreement. The <br />Commencement Date shall be no later than five (5) days after City's issuance of the <br /> <br />CONSTRUCTION SERVICE CONTRACT NO. CI I 12.01 I <br /> <br />Page 3 oF28 C' <br />..:; <br /> <br />.." <br />'..-1 <br />U <br />
The URL can be used to link to this page
Your browser does not support the video tag.